Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

Sites hidden

  1. Palomar Energy24%559MWPlant · Gas, combined cycle · San Diego, CA · since 2005 · San Diego Gas & Electric Co
  2. CED West Side Canal Battery Storage—131MWPlant · Storage · Imperial, CA · since 2023 · San Diego Gas & Electric Co
  3. Miramar Energy Facility2%106MWPlant · Gas, combustion turbine · San Diego, CA · since 2005 · San Diego Gas & Electric Co
  4. Cuyamaca Peak Energy Plant2%48.7MWPlant · Gas, combustion turbine · San Diego, CA · since 2002 · San Diego Gas & Electric Co
  5. Fallbrook Energy Storage—40MWPlant · Storage · San Diego, CA · since 2023 · San Diego Gas & Electric Co
  6. Top Gun Energy Storage—30MWPlant · Storage · San Diego, CA · since 2021 · San Diego Gas & Electric Co
  7. Melrose BESS—20MWPlant · Storage · San Diego, CA · since 2024 · San Diego Gas & Electric Co
  8. Kearny North Energy Storage—10MWPlant · Storage · San Diego, CA · since 2022 · San Diego Gas & Electric Co
  9. Kearny South Energy Storage—10MWPlant · Storage · San Diego, CA · since 2022 · San Diego Gas & Electric Co
  10. Clairemont Energy Storage—10MWPlant · Storage · San Diego, CA · since 2024 · San Diego Gas & Electric Co
  11. Paradise Energy Storage—10MWPlant · Storage · San Diego, CA · since 2024 · San Diego Gas & Electric Co
  12. Boulevard Energy Storage—10MWPlant · Storage · San Diego, CA · since 2024 · San Diego Gas & Electric Co
  13. Pala Gomez Creek BESS—10MWPlant · Storage · San Diego, CA · since 2024 · San Diego Gas & Electric Co
  14. Elliott Energy Storage—10MWPlant · Storage · San Diego, CA · since 2024 · San Diego Gas & Electric Co
  15. Santee BESS—10MWPlant · Storage · San Diego, CA · since 2026 · San Diego Gas & Electric Co
  16. El Cajon Energy Storage—7.5MWPlant · Storage · San Diego, CA · since 2017 · San Diego Gas & Electric Co
  17. Dark Sky Energy Center—7.3MWPlant · Storage · San Diego, CA · since 2025 · San Diego Gas & Electric Co
  18. Ramona Solar Energy5%4.3MWPlant · Solar · San Diego, CA · since 2017 · San Diego Gas & Electric Co
  19. Vanadium Redox Flow Battery Plant—2MWPlant · Storage · San Diego, CA · since 2017 · SDGE Batteries
Operating plants in view, sorted by MW, descending
Palomar EnergyPlantOperating559MW24%2005EIA-860M
CED West Side Canal Battery StoragePlantOperating131MW—2023EIA-860M
Miramar Energy FacilityPlantOperating106MW2%2005EIA-860M
Cuyamaca Peak Energy PlantPlantOperating48.7MW2%2002EIA-860M
Fallbrook Energy StoragePlantOperating40MW—2023EIA-860M
Top Gun Energy StoragePlantOperating30MW—2021EIA-860M
Melrose BESSPlantOperating20MW—2024EIA-860M
Kearny North Energy StoragePlantOperating10MW—2022EIA-860M
Kearny South Energy StoragePlantOperating10MW—2022EIA-860M
Clairemont Energy StoragePlantOperating10MW—2024EIA-860M
Paradise Energy StoragePlantOperating10MW—2024EIA-860M
Boulevard Energy StoragePlantOperating10MW—2024EIA-860M
Pala Gomez Creek BESSPlantOperating10MW—2024EIA-860M
Elliott Energy StoragePlantOperating10MW—2024EIA-860M
Santee BESSPlantOperating10MW—2026EIA-860M
El Cajon Energy StoragePlantOperating7.5MW—2017EIA-860M
Dark Sky Energy CenterPlantOperating7.3MW—2025EIA-860M
Ramona Solar EnergyPlantOperating4.3MW5%2017EIA-860M
Vanadium Redox Flow Battery PlantPlantOperating2MW—2017EIA-860M

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions