Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned70.60
Under construction1<0.10
Operating121.20
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. True North Solar, LLC27%238.8MWPlant · Solar · Falls, TX · since 2024 · Avangrid Power LLC
  2. Montague Solar19%162MWPlant · Solar · Gilliam, OR · since 2023 · Avangrid Power LLC
  3. Daybreak Solar26%151.7MWPlant · Solar · Wasco, OR · since 2025 · Avangrid Power LLC
  4. Lund Hill Solar28%150MWPlant · Solar · Klickitat, WA · since 2022 · Avangrid Power LLC
  5. Powell Creek Solar23%150MWPlant · Solar · Putnam, OH · since 2025 · Avangrid Power LLC
  6. Allen Acres Solar—150MWProject · Solar · LaSalle, IL · due May 2029 · Avangrid Power LLC
  7. Bluebird Solar—140MWProject · Solar · Klickitat, WA · due Dec 2027 · Avangrid Power LLC
  8. Tower Solar, LLC—120MWPlant · Solar · Morrow, OR · since 2026 · Avangrid Power LLC
  9. Sunset Solar—103MWProject · Solar · Wasco, OR · due Dec 2028 · Avangrid Power LLC
  10. Mohawk Solar—90.5MWProject · Solar · Montgomery, NY · due Dec 2027 · Avangrid Power LLC
  11. Bright Mountain Solar—80MWProject · Solar · Perry, KY · due Dec 2027 · Avangrid Power LLC
  12. Bakeoven Solar27%60MWPlant · Solar · Wasco, OR · since 2023 · Avangrid Power LLC
  13. Solar Star Oregon II25%56.3MWPlant · Solar · Crook, OR · since 2017 · Avangrid Power LLC
  14. Great Bear Solar, LLC—46MWProject · Solar · Van Wert, OH · due Dec 2027 · Avangrid Power LLC
  15. Camino Solar Hybrid35%44MWPlant · Solar · Kern, CA · since 2025 · Avangrid Power LLC
  16. Oregon Trail Solar—41MWProject · Solar · Gilliam, OR · due Mar 2027 · Avangrid Power LLC
  17. San Luis Valley Solar Ranch19%35MWPlant · Solar · Alamosa, CO · since 2011 · Avangrid Power LLC
  18. Poseidon Solar, LLC28%20MWPlant · Solar · GILA, AZ · since 2011 · Axium Arizona Renewables, LLC
  19. Kettleman Solar—20MWProject · Solar + storage · Kings, CA · due Apr 2025 · Avangrid Power LLC
  20. WyEast Solar27%10MWPlant · Solar · Sherman, OR · since 2018 · Avangrid Power LLC
All records in view, sorted by MW, descending
True North Solar, LLCPlantOperating238.8MW27%2024EIA-860M
Montague SolarPlantOperating162MW19%2023EIA-860M
Daybreak SolarPlantOperating151.7MW26%2025EIA-860M
Lund Hill SolarPlantOperating150MW28%2022EIA-860M
Powell Creek SolarPlantOperating150MW23%2025EIA-860M
Allen Acres SolarProjectPlanned150MW—May 2029EIA-860M
Bluebird SolarProjectPlanned140MW—Dec 2027EIA-860M
Tower Solar, LLCPlantOperating120MW—2026EIA-860M
Sunset SolarProjectPlanned103MW—Dec 2028EIA-860M
Mohawk SolarProjectPlanned90.5MW—Dec 2027EIA-860M
Bright Mountain SolarProjectPlanned80MW—Dec 2027EIA-860M
Bakeoven SolarPlantOperating60MW27%2023EIA-860M
Solar Star Oregon IIPlantOperating56.3MW25%2017EIA-860M
Great Bear Solar, LLCProjectPlanned46MW—Dec 2027EIA-860M
Camino Solar HybridPlantOperating44MW35%2025EIA-860M
Oregon Trail SolarProjectUnder construction41MW—Mar 2027EIA-860M
San Luis Valley Solar RanchPlantOperating35MW19%2011EIA-860M
Poseidon Solar, LLCPlantOperating20MW28%2011EIA-860M
Kettleman SolarProjectPlanned20MW—Apr 2025CAISO
WyEast SolarPlantOperating10MW27%2018EIA-860M

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions