Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned1<0.10
Under construction111.50
Operating110.80
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. Deckerville Solar Park (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—213.2MWProject · Solar · Sanilac, MI · due Nov 2028 · DTE Electric Company
  2. Poseyville Solar Park—206.4MWProject · Solar · Midland, MI · due Apr 2028 · DTE Electric Company
  3. Silver Creek Solar Park—200MWProject · Solar · Huron, MI · due Aug 2028 · DTE Electric Company
  4. Peatville Solar Park—185MWProject · Solar · Sanilac, MI · due Jul 2028 · DTE Electric Company
  5. Au Gres Solar Park (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—179.5MWProject · Solar · Arenac, MI · due Aug 2028 · DTE Electric Company
  6. Mission Road Solar Park—172MWPlant · Solar · Isabella, MI · since 2026 · DTE Electric Company
  7. Sauk Solar Park18%150MWPlant · Solar · Branch, MI · since 2025 · DTE Electric Company
  8. Little Trout Solar—150MWProject · Solar · Presque Isle, MI · due Dec 2026 · DTE Electric Company
  9. Fish Creek Solar Park—146.2MWPlant · Solar · Montcalm, MI · since 2026 · DTE Electric Company
  10. Cedar Field Solar Park—145MWProject · Solar · Gladwin, MI · due Jul 2027 · DTE Electric Company
  11. Polaris Solar Park18%100MWPlant · Solar · Gratiot, MI · since 2025 · DTE Electric Company
  12. Cold Creek Solar Park—100MWPlant · Solar · Branch, MI · since 2026 · DTE Electric Company
  13. Strasburg Solar Park—100MWProject · Solar · Monroe, MI · due Dec 2028 · DTE Electric Company
  14. Pine River Solar Park18%80MWPlant · Solar · Gratiot, MI · since 2025 · DTE Electric Company
  15. Beecher Solar Park—80MWProject · Solar · Lenawee, MI · due Jun 2027 · DTE Electric Company
  16. Gratiot Solar Park—50MWProject · Solar · Gratiot, MI · due Oct 2026 · DTE Electric Company
  17. Demille Solar Farm14%28.4MWPlant · Solar · Lapeer, MI · since 2017 · DTE Electric Company
  18. Turrill Solar Farm12%19.6MWPlant · Solar · Lapeer, MI · since 2017 · DTE Electric Company
  19. City of Detroit Castle Solar—10MWProject · Solar · Wayne, MI · due Nov 2026 · DTE Electric Company
  20. City of Detroit Greenfield—7MWProject · Solar · Wayne, MI · due Sep 2027 · DTE Electric Company
  21. O'Shea Solar Farm17%2MWPlant · Solar · Wayne, MI · since 2017 · DTE Electric Company
  22. Greenwood Solar Farm13%1.4MWPlant · Solar · St Clair, MI · since 2016 · DTE Electric Company
  23. Domino Farms Solar9%1MWPlant · Solar · Washtenaw, MI · since 2015 · DTE Electric Company
All records in view, sorted by MW, descending
Deckerville Solar ParkProjectUnder construction (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)213.2MW—Nov 2028EIA-860M
Poseyville Solar ParkProjectUnder construction206.4MW—Apr 2028EIA-860M
Silver Creek Solar ParkProjectUnder construction200MW—Aug 2028EIA-860M
Peatville Solar ParkProjectUnder construction185MW—Jul 2028EIA-860M
Au Gres Solar ParkProjectUnder construction (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)179.5MW—Aug 2028EIA-860M
Mission Road Solar ParkPlantOperating172MW—2026EIA-860M
Sauk Solar ParkPlantOperating150MW18%2025EIA-860M
Little Trout SolarProjectUnder construction150MW—Dec 2026EIA-860M
Fish Creek Solar ParkPlantOperating146.2MW—2026EIA-860M
Cedar Field Solar ParkProjectUnder construction145MW—Jul 2027EIA-860M
Polaris Solar ParkPlantOperating100MW18%2025EIA-860M
Cold Creek Solar ParkPlantOperating100MW—2026EIA-860M
Strasburg Solar ParkProjectUnder construction100MW—Dec 2028EIA-860M
Pine River Solar ParkPlantOperating80MW18%2025EIA-860M
Beecher Solar ParkProjectUnder construction80MW—Jun 2027EIA-860M
Gratiot Solar ParkProjectUnder construction50MW—Oct 2026EIA-860M
Demille Solar FarmPlantOperating28.4MW14%2017EIA-860M
Turrill Solar FarmPlantOperating19.6MW12%2017EIA-860M
City of Detroit Castle SolarProjectUnder construction10MW—Nov 2026EIA-860M
City of Detroit GreenfieldProjectPlanned7MW—Sep 2027EIA-860M
O'Shea Solar FarmPlantOperating2MW17%2017EIA-860M
Greenwood Solar FarmPlantOperating1.4MW13%2016EIA-860M
Domino Farms SolarPlantOperating1MW9%2015EIA-860M

Status not current MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0)

Status not current

The status is the one the file states on that date, not the register’s current one.

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions