Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned000
Under construction000
Operating132.80
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Sites hidden

  1. Markbygden wind farm—2,003MWPlant · Wind · Sweden · since 2015 · Enercon; Markbygden Vind; Skogberget Vind
  2. Sapphire-Tricon wind farm—150MWPlant · Wind · Pakistan · since 2017 · General Electric
  3. Morjar wind farm—148MWPlant · Wind · India · since 2022
  4. Cordal wind farm—90MWPlant · Wind · Ireland · since 2018 · General Electric
  5. Yelisirur wind farm—68MWPlant · Wind · India · since 2012 · General Electric
  6. Master Wind Energy wind farm—53MWPlant · Wind · Pakistan · since 2016 · Hydrochina CORP (PowerChina); General Electric
  7. Tenega Generasi wind farm—50MWPlant · Wind · Pakistan · since 2016 · General Electric
  8. Hawa Energy wind farm—50MWPlant · Wind · Pakistan · since 2018 · General Electric
  9. Sapphire wind farm (Pakistan)—50MWPlant · Wind · Pakistan · since 2015 · General Electric
  10. Jhimpir Power (Burj Capital) wind farm—50MWPlant · Wind · Pakistan · since 2018 · Harbin Electric; General Electric
  11. Baleni wind farm—50MWPlant · Wind · Romania · since 2013 · General Electric
  12. Rudine wind farm—34MWPlant · Wind · Croatia · since 2016 · General Electric
  13. Haliade-X Massvlakte Prototype Onshore offshore wind farm—12MWPlant · Wind · Netherlands · since 2019 · General Electric
All records in view, sorted by MW, descending
Markbygden wind farmPlantOperating2,003MW—2015GEM
Sapphire-Tricon wind farmPlantOperating150MW—2017GEM
Morjar wind farmPlantOperating148MW——2022GEM
Cordal wind farmPlantOperating90MW—2018GEM
Yelisirur wind farmPlantOperating68MW—2012GEM
Master Wind Energy wind farmPlantOperating53MW—2016GEM
Tenega Generasi wind farmPlantOperating50MW—2016GEM
Hawa Energy wind farmPlantOperating50MW—2018GEM
Sapphire wind farm (Pakistan)PlantOperating50MW—2015GEM
Jhimpir Power (Burj Capital) wind farmPlantOperating50MW—2018GEM
Baleni wind farmPlantOperating50MW—2013GEM
Rudine wind farmPlantOperating34MW—2016GEM
Haliade-X Massvlakte Prototype Onshore offshore wind farmPlantOperating12MW—2019GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions