Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned000
Under construction1<0.10
Operating148.50
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Sites hidden

  1. Costanera power station—2,304MWPlant · Gas, combined cycle · Argentina · since 1964
  2. Puerto power station—1,747MWPlant · Gas, steam turbine · Argentina · since 1961
  3. Manuel Belgrano I power station—868MWPlant · Gas, combined cycle · Argentina · since 2010 · Termoeléctrica Manuel Belgrano
  4. Timbúes power station—865MWPlant · Gas, combined cycle · Argentina · since 2010 · Termoeléctrica José de San Martín
  5. Vuelta De Obligado power station—841MWPlant · Gas, combined cycle · Argentina · since 2018 · Central Vuelta de Obligado
  6. Luján De Cuyo power station—521MWPlant · Gas, combined cycle · Argentina · since 1971
  7. Brigadier López power station—421MWPlant · Gas, combined cycle · Argentina · since 2026
  8. Terminal 6 San Lorenzo cogeneration plant—391MWPlant · Gas, combined cycle · Argentina · since 2021
  9. La Genoveva wind farm—129MWPlant · Wind · Argentina · since 2019 · Central Puerto
  10. Achiras wind farm—128MWPlant · Wind · Argentina · since 2018 · Central Puerto
  11. Guañizuil Solar Power Plant—117MWPlant · Solar · Argentina · since 2021
  12. La Castellana wind farm—114MWPlant · Wind · Argentina · since 2018 · Central Puerto
  13. Manque wind farm—57MWPlant · Wind · Argentina · since 2019 · Central Puerto
  14. Los Olivos wind farm—23MWPlant · Wind · Argentina · since 2020 · Central Puerto
  15. San Carlos solar farm (Argentina) --—15MWProject · Solar · Salta, Argentina · Central Puerto SA
All records in view, sorted by MW, descending
Costanera power stationPlantOperating2,304MW——1964GEM
Puerto power stationPlantOperating1,747MW——1961GEM
Manuel Belgrano I power stationPlantOperating868MW—2010GEM
Timbúes power stationPlantOperating865MW—2010GEM
Vuelta De Obligado power stationPlantOperating841MW—2018GEM
Luján De Cuyo power stationPlantOperating521MW——1971GEM
Brigadier López power stationPlantOperating421MW——2026GEM
Terminal 6 San Lorenzo cogeneration plantPlantOperating391MW——2021GEM
La Genoveva wind farmPlantOperating129MW—2019GEM
Achiras wind farmPlantOperating128MW—2018GEM
Guañizuil Solar Power PlantPlantOperating117MW——2021GEM
La Castellana wind farmPlantOperating114MW—2018GEM
Manque wind farmPlantOperating57MW—2019GEM
Los Olivos wind farmPlantOperating23MW—2020GEM
San Carlos solar farm (Argentina) --ProjectUnder construction15MW——GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions