Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesMWNo MW
Planned237220
Under construction000
Operating000
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Sites hidden

  1. Futura solar farm 23—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  2. Futura solar farm 26—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  3. Futura solar farm 25—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  4. Futura solar farm 24—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  5. Futura solar farm 28—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  6. Futura solar farm 27—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  7. Futura solar farm 29—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  8. Futura solar farm 32—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  9. Futura solar farm 30—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  10. Futura solar farm 31—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  11. Futura solar farm 36—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  12. Futura solar farm 35—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  13. Futura solar farm 33—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  14. Futura solar farm 34—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  15. Futura solar farm 38—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  16. Futura solar farm 41—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  17. Futura solar farm 37—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  18. Futura solar farm 39—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  19. Futura solar farm 40—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  20. Futura solar farm 42—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  21. Futura solar farm 43—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  22. Futura solar farm 45—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
  23. Futura solar farm 44—31.4MWProject · Solar · Bahia, Brazil · Futura Energia e Holding Ltda
All records in view, sorted by MW, descending
Futura solar farm 23ProjectPlanned31.4MW——GEM
Futura solar farm 26ProjectPlanned31.4MW——GEM
Futura solar farm 25ProjectPlanned31.4MW——GEM
Futura solar farm 24ProjectPlanned31.4MW——GEM
Futura solar farm 28ProjectPlanned31.4MW——GEM
Futura solar farm 27ProjectPlanned31.4MW——GEM
Futura solar farm 29ProjectPlanned31.4MW——GEM
Futura solar farm 32ProjectPlanned31.4MW——GEM
Futura solar farm 30ProjectPlanned31.4MW——GEM
Futura solar farm 31ProjectPlanned31.4MW——GEM
Futura solar farm 36ProjectPlanned31.4MW——GEM
Futura solar farm 35ProjectPlanned31.4MW——GEM
Futura solar farm 33ProjectPlanned31.4MW——GEM
Futura solar farm 34ProjectPlanned31.4MW——GEM
Futura solar farm 38ProjectPlanned31.4MW——GEM
Futura solar farm 41ProjectPlanned31.4MW——GEM
Futura solar farm 37ProjectPlanned31.4MW——GEM
Futura solar farm 39ProjectPlanned31.4MW——GEM
Futura solar farm 40ProjectPlanned31.4MW——GEM
Futura solar farm 42ProjectPlanned31.4MW——GEM
Futura solar farm 43ProjectPlanned31.4MW——GEM
Futura solar farm 45ProjectPlanned31.4MW——GEM
Futura solar farm 44ProjectPlanned31.4MW——GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.