US energy projects and power plants, from first filing to retirement.
Public records, free to use. Every record links to its source.
| Stage | Sites | GW | No MW |
|---|---|---|---|
| Planned | 33 | 7.1 | 0 |
| Under construction | 17 | 0.8 | 0 |
| Operating | 330 | 23.4 | 0 |
| Idling or retired | 21 | 8.0 | 0 |
Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.
Loads · GW demand by tier, never summed
Sites hidden
- Armadillo Solar Center—150.5MW
- Baldy Mesa Storage—100MW
- Mirasol solar farm --—100MW
- Glen Canyon Solar A, LLC—95MW
- Halifax County Solar—80MW
- Jasmine—70MW
- Cajuina wind farm Ventos de Santa Tereza 09—63MW
- AES Waiawa Phase 2 Solar—60MW
- Cajuina wind farm Ventos de Santa Tereza 11—49.5MW
- Holcim Cement Plant solar farm --—21.4MW
- AES Mountain View Solar—14MW
- Cajuina wind farm Ventos de Santa Tereza 06—9MW
- Kieser—5MW
- Allen CSG—5MW
- DeVillez—3.3MW
- Sapphire Solar NY—2.4MW
- Downsville II—2MW
| Armadillo Solar Center | Project | Under construction | 150.5MW | — | Feb 2027 | ERCOT | |||
| Baldy Mesa Storage | Project | Under construction | 100MW | — | Feb 2027 | EIA-860M | |||
| Mirasol solar farm -- | Project | Under construction | 100MW | — | — | GEM | |||
| Glen Canyon Solar A, LLC | Project | Under construction | 95MW | — | Dec 2028 | EIA-860M | |||
| Halifax County Solar | Project | Under construction | 80MW | — | Oct 2026 | EIA-860M | |||
| Jasmine | Project | Under construction | 70MW | — | Dec 2027 | EIA-860M | |||
| Cajuina wind farm Ventos de Santa Tereza 09 | Project | Under construction | 63MW | — | — | GEM | |||
| AES Waiawa Phase 2 Solar | Project | Under construction | 60MW | — | Oct 2026 | EIA-860M | |||
| Cajuina wind farm Ventos de Santa Tereza 11 | Project | Under construction | 49.5MW | — | — | GEM | |||
| Holcim Cement Plant solar farm -- | Project | Under construction | 21.4MW | — | — | GEM | |||
| AES Mountain View Solar | Project | Under construction | 14MW | — | Nov 2026 | EIA-860M | |||
| Cajuina wind farm Ventos de Santa Tereza 06 | Project | Under construction | 9MW | — | — | GEM | |||
| Kieser | Project | Under construction | 5MW | — | Oct 2026 | EIA-860M | |||
| Allen CSG | Project | Under construction | 5MW | — | Jan 2027 | EIA-860M | |||
| DeVillez | Project | Under construction | 3.3MW | — | Nov 2026 | EIA-860M | |||
| Sapphire Solar NY | Project | Under construction | 2.4MW | — | Nov 2026 | EIA-860M | |||
| Downsville II | Project | Under construction | 2MW | — | Nov 2026 | EIA-860M |
Generation ·
Interested in this project?
What is counted
- Counts follow the map: move it or pick a state.
- Planned and Construction: every project a register still lists.
- Withdrawn and canceled: not counted or drawn; each keeps its own page.
- Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
- No stage chosen: all stages together, retired plants left out.
- Built projects are drawn among the plants, never counted twice.
- Not on this map: projects placed only by county or state, or with the site withheld by license.
- They are counted, not drawn, once the view holds that whole area.
- Data center MW is demand, never added to generation.
Generation
Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.
Under Color: Utilization, the least-run plants for their technology are darkest.
Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.
Power lines Partial coverage
Transmission lines by voltage.
OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.
© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)
Substations
Zoom in to see substations.
OpenStreetMap, where loaded (Texas for now).
© OpenStreetMap contributors (ODbL)
Pipelines
Pipelines by product, and the facilities along them.
EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.
EIA (public domain)
Power prices
Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Commercial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Residential. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Wholesale. Energy price only: no delivery, capacity or demand charges. California ISO and Western EIM areas only.
Sites
Plants, projects and data centers. Turn off to see only the layers.
Fiber by county
Availability by county, not routes.
Unshaded: not stated.
Fiber providers (county, approx.). Providers reporting fiber availability somewhere in the county. Not a route to a site, not carrier-neutral or long-haul fiber.
Download grid data
- Power lines 203,951 rows · 68 MB
- Substations 69,120 rows · 7 MB
GeoParquet · snapshot Oct 10, 2026
© OpenStreetMap contributors, ODbL. A database you derive from these files must stay under ODbL.
Convert to GeoJSON or Shapefile:ogr2ogr -f GeoJSON lines.geojson lines.parquetogr2ogr -f 'ESRI Shapefile' lines.shp lines.parquet
Transmission lines layer: LBNL download page, Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0.