US energy projects and power plants, from first filing to retirement.
Public records, free to use. Every record links to its source.
| Stage | Sites | GW | No MW |
|---|---|---|---|
| Planned | 4 | 0.4 | 0 |
| Under construction | 1 | 0.2 | 0 |
| Operating | 66 | 6.6 | 0 |
| Idling or retired | 0 | 0 | 0 |
Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.
Loads · GW demand by tier, never summed
Sites hidden
- Xinjiang Hami (China Three Gorges) Integrated solar farm—1,000MW
- Chongqing Wushan Liangping Chengguang solar farm—395MW
- Guangxi Qinnan Dongchangzhen (Minhai) solar farm—300MW
- Shanxi Xiyang PV and Storage (Three Gorges) solar power plant—300MW
- Shaanxi Tongchuan Liujianian solar farm—250MW
- Hebei Province Quyang (Three Gorges) solar farm—200MW
- Ningxia Wuzhong Litong District Three Gorges solar farm—200MW
- Gansu Wuwei Liangzhou Jiuduntan (Three Gorges) Desert Control solar power plant—200MW
- Hebei Xinle (Three Gorges) Agriculture solar farm—200MW
- Shaanxi Huanglong Three Gorges solar power plant --—200MW
- Zhejiang Province Yueqing Zhengtai Agriculture Light Complementary solar farm—150MW
- Anhui Province Huainan Panji "Front Runner Plan" solar farm—150MW
- Jiangsu Danyang Huangtangzhen (Three Gorges) solar farm --—150MW
- Jiangsu Danyang Daoshuzhen (Three Gorges) solar farm—120MW
- Inner Mongolia Xilinguole Zhenglan Banner Three Gorges solar farm—100MW
- Jiangsu Province Sihong Shuanggou Town Herding and Light Complementary solar farm—100MW
- Shaanxi Province Weinan "Front Runner" Jinyuzhen solar farm—100MW
- Gansu Province Jiuquan Guazhou Grid-Connected solar farm—100MW
- Jiangxi Province Wan'an Three Gorges New Energy solar farm—100MW
- Shaanxi Province Chunhua Shiliyuan solar farm—100MW
- Shanxi Pingding Shimenkou Three Gorges solar farm—100MW
- Shanxi Yushe Jichengzhen Qiyang solar farm—100MW
- Qinghai Golmud "Front Runner" Three Gorges No.2 solar farm—100MW
- Qinghai Golmud "Front Runner" Three Gorges No.3 solar farm—100MW
- Qinghai Golmud "Front Runner" Three Gorges No.1 solar farm—100MW
- Qinghai Golmud "Front Runner" Three Gorges No.4 solar farm—100MW
- Qinghai Golmud "Front Runner" Three Gorges No.5 solar farm—100MW
- Guangxi Binyang Gula Fishery solar farm—100MW
- Shaanxi Dali Guanchizhen (Chiguang) solar farm—100MW
- Heibei Fengning Dongrun Jieyuan solar farm—100MW
- Shanxi Hequ (Three Gorges) solar farm—100MW
- Qinghai Hainanzhou 2020-2 Plot solar farm --—100MW
- Qinghai Province Golmud Three Gorges Grid-Connected solar farm—90MW
- Zhejiang Wuxing Donglin Photovoltaic solar farm—80MW
- Shandong Gaotang Jiangdianzhen solar farm—60MW
- Guangdong Shixing Xingtai Agriculture solar farm—60MW
- Hebei Province Guyuan Huanggainao Dagouying solar farm—50MW
- Anhui Province Chaohu Suwan solar farm—50MW
- Shandong Province Weishan Xiaobuwan Three Gorges solar farm—50MW
- Gansu Province Yongchang Dazhaitan Grid-Conneted solar farm—50MW
- Gansu Province Yongchang Heqingtan Grid-Conneted solar farm—50MW
- Gansu Province Jiuquan Suzhou Chaoyang Grid-Connected solar farm—50MW
- Gansu Province Jiuquan Suzhou Sanyang Grid-Connected solar farm—50MW
- Hebei Guyuan Dagouying Three Gorges solar farm—50MW
- Sichuan Liangshan Butuo Baoguping solar farm—50MW
- Shandong Three Gorges New Energy Weishan solar farm—50MW
- Anhui Chaohu Langanji solar farm—50MW
- Guangdong Luhe Shanghu Agriculture solar farm --—50MW
- Guangdong Yangshan Xiaojiang (Three Gorges) solar farm --—50MW
- Shandong Province Mengyin Three Gorges solar farm—40MW
Generation ·
Interested in this project?
What is counted
- Counts follow the map: move it or pick a state.
- Planned and Construction: every project a register still lists.
- Withdrawn and canceled: not counted or drawn; each keeps its own page.
- Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
- No stage chosen: all stages together, retired plants left out.
- Built projects are drawn among the plants, never counted twice.
- Not on this map: projects placed only by county or state, or with the site withheld by license.
- They are counted, not drawn, once the view holds that whole area.
- Data center MW is demand, never added to generation.
Generation
Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.
Under Color: Utilization, the least-run plants for their technology are darkest.
Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.
Power lines Partial coverage
Transmission lines by voltage.
OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.
© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)
Substations
Zoom in to see substations.
OpenStreetMap, where loaded (Texas for now).
© OpenStreetMap contributors (ODbL)
Pipelines
Pipelines by product, and the facilities along them.
EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.
EIA (public domain)
Power prices
Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Commercial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Residential. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Wholesale. Energy price only: no delivery, capacity or demand charges. California ISO and Western EIM areas only.
Sites
Plants, projects and data centers. Turn off to see only the layers.
Fiber by county
Availability by county, not routes.
Unshaded: not stated.
Fiber providers (county, approx.). Providers reporting fiber availability somewhere in the county. Not a route to a site, not carrier-neutral or long-haul fiber.
Download grid data
- Power lines 203,951 rows · 68 MB
- Substations 69,120 rows · 7 MB
GeoParquet · snapshot Oct 10, 2026
© OpenStreetMap contributors, ODbL. A database you derive from these files must stay under ODbL.
Convert to GeoJSON or Shapefile:ogr2ogr -f GeoJSON lines.geojson lines.parquetogr2ogr -f 'ESRI Shapefile' lines.shp lines.parquet
Transmission lines layer: LBNL download page, Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0.