Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

Sites hidden

  1. Boitzenburger Land solar farm—180MWPlant · Solar · Germany · since 2023 · SEBG Energiepark
  2. Klettwitz Solar Park—170MWPlant · Solar · Germany · since 2022 · Energiepark Lausitz; Solarpark Klettwitz Süd
  3. Klettwitz Solar Park 1-3—120MWProject · Solar · Brandenburg, Germany · GP Joule
  4. Senftenberg Joule solar farm—76MWPlant · Solar · Germany · since 2011 · GP Joule
  5. Pompogne Solar Park—40MWPlant · Solar · France · since 2013 · GP Joule
  6. Zagelsdorf wind farm—30MWPlant · Wind · Germany · since 2016 · GP Joule
  7. Lüngholm wind farm—24MWPlant · Wind · Germany · since 2023 · Windpark Lüngholm
  8. Weichs solar farm --—22MWProject · Solar · Bavaria, Germany · GP Joule
  9. Ammerland Solarpark—20.8MWPlant · Solar · Germany · since 2011 · GP Joule
  10. Schimmendorf wind farm—17MWPlant · Wind · Germany · since 2017 · GP Joule
  11. Pinnow (Joule) wind farm—14MWPlant · Wind · Germany · since 2012 · GP Joule
  12. Schwesing wind farm—14MWPlant · Wind · Germany · since 2015 · GP Joule
  13. Wittbek wind farm—13MWPlant · Wind · Germany · since 2015 · GP Joule
  14. Lindenberg (Blue Elephant Energy) wind farm—12MWPlant · Wind · Germany · since 2015 · GP Joule
All records in view, sorted by MW, descending
Boitzenburger Land solar farmPlantOperating180MW—2023GEM
Klettwitz Solar ParkPlantOperating170MW—2022GEM
Klettwitz Solar Park 1-3ProjectPlanned120MW——GEM
Senftenberg Joule solar farmPlantOperating76MW—2011GEM
Pompogne Solar ParkPlantOperating40MW—2013GEM
Zagelsdorf wind farmPlantOperating30MW—2016GEM
Lüngholm wind farmPlantOperating24MW—2023GEM
Weichs solar farm --ProjectPlanned22MW——GEM
Ammerland SolarparkPlantOperating20.8MW—2011GEM
Schimmendorf wind farmPlantOperating17MW—2017GEM
Pinnow (Joule) wind farmPlantOperating14MW—2012GEM
Schwesing wind farmPlantOperating14MW—2015GEM
Wittbek wind farmPlantOperating13MW—2015GEM
Lindenberg (Blue Elephant Energy) wind farmPlantOperating12MW—2015GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions