US energy projects and power plants, from first filing to retirement.
Public records, free to use. Every record links to its source.
Sites hidden
- Kileler (Karatzi) solar project—79.4MW
- Kritsilar solar farm—72.8MW
- Neo Perivoli solar farm KL104—30MW
- Neo Perivoli solar farm KL105—30MW
- Neo Perivoli solar farm KL116—30MW
- Neo Perivoli solar farm KL118—30MW
- Neo Perivoli solar farm KL119—30MW
- Kastraki solar farm 1—20MW
- Kastraki solar farm 2—15MW
- Kastraki solar farm 3—15MW
- Larisa Agr. 1243 solar project—13MW
- Larisa Agr. 326 solar project—12MW
- Larisa Agr. 1234 solar project—10MW
- Larisa Agr. 220-228 Palaiochori Enistu solar project—10MW
- Nees Karues (Karatsi) solar project 126—10MW
- Neo Perivoli solar farm K110—10MW
- Larisa Agr. 400-401solar project—9MW
- Larisa Agr. 175-176-171 solar project—8MW
- Larisa Agr. 3-4-5-7-8-9-375-448 solar project—8MW
- Larisa Agr. 394-395 solar project—8MW
- Nees Karues (Karatsi) solar project 127—8MW
- Neo Perivoli solar farm K113—8MW
- Zarkadochori solar project I --—8MW
- Kastraki solar farm 4—7MW
- Koukkou solar farm—5.5MW
- Larisa Agr 173 solar project --—5MW
- Choundri solar farm—2MW
- Konizos solar farm—2MW
- Soupasi Reza solar farm—2MW
- Photolivos (Plot 554) solar farm—1.5MW
- Gerenia solar project—1MW
Generation ·
Interested in this project?
What is counted
- Counts follow the map: move it or pick a state.
- Planned and Construction: every project a register still lists.
- Withdrawn and canceled: not counted or drawn; each keeps its own page.
- Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
- No stage chosen: all stages together, retired plants left out.
- Built projects are drawn among the plants, never counted twice.
- Not on this map: projects placed only by county or state, or with the site withheld by license.
- They are counted, not drawn, once the view holds that whole area.
- Data center MW is demand, never added to generation.
Generation
Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.
Under Color: Utilization, the least-run plants for their technology are darkest.
Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.
Power lines Partial coverage
Transmission lines by voltage.
OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.
© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)
Substations
Zoom in to see substations.
OpenStreetMap, where loaded (Texas for now).
© OpenStreetMap contributors (ODbL)
Pipelines
Pipelines by product, and the facilities along them.
EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.
EIA (public domain)
Power prices
Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Commercial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Residential. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Wholesale. Energy price only: no delivery, capacity or demand charges. California ISO and Western EIM areas only.
Sites
Plants, projects and data centers. Turn off to see only the layers.
Fiber by county
Availability by county, not routes.
Unshaded: not stated.
Fiber providers (county, approx.). Providers reporting fiber availability somewhere in the county. Not a route to a site, not carrier-neutral or long-haul fiber.
Download grid data
- Power lines 203,951 rows · 68 MB
- Substations 69,120 rows · 7 MB
GeoParquet · snapshot Oct 10, 2026
© OpenStreetMap contributors, ODbL. A database you derive from these files must stay under ODbL.
Convert to GeoJSON or Shapefile:ogr2ogr -f GeoJSON lines.geojson lines.parquetogr2ogr -f 'ESRI Shapefile' lines.shp lines.parquet
Transmission lines layer: LBNL download page, Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0.