Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned10.10
Under construction41.20
Operating514.00
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. Hombal wind farm --—301MWProject · Wind · Karnataka, India · ReNew Power
  2. Kutch (Renew) II wind farm—300MWPlant · Wind · India · Approximate location · since 2021
  3. Maharashtra (Renew) wind farm --—300MWProject · Wind · Maharashtra, India · ReNew Power
  4. SECI XI (Renew) wind farm --—300MWProject · Wind · Karnataka, India · ReNew Power
  5. Tondehal wind farm --—300MWProject · Wind · Karnataka, India · ReNew Power
  6. Kutch (Renew) I wind farm—250MWPlant · Wind · India · Approximate location · since 2018 · Vestas Wind Systems
  7. Kutch (Renew) V wind farm—250MWPlant · Wind · India · Approximate location · since 2019
  8. Bellary-Devanagere SECI-6 (Ostro) wind farm—199.5MWPlant · Wind · India · Approximate location · since 2023
  9. Borampalli (Renew) wind farm—197MWPlant · Wind · India · Approximate location · since 2018
  10. Ralla wind farm—197MWPlant · Wind · India · Approximate location · since 2017
  11. Vaspet (Renew) wind farm—144MWPlant · Wind · India · Approximate location · since 2013 · ReNew Power
  12. Ellutala wind farm—132MWPlant · Wind · India · Approximate location · since 2016
  13. Bhakrani (CLP) wind farm—118MWPlant · Wind · India · since 2013
  14. Amba (Renew) wind farm—118MWPlant · Wind · India · Approximate location · since 2016
  15. Lahori (Renew) wind farm—118MWPlant · Wind · India · Approximate location · since 2016
  16. Veerabhadra wind farm—101MWPlant · Wind · India · Approximate location · since 2017
  17. Bellary-Devanagere SECI-6 (Ostro) wind farm 2—100.5MWProject · Wind · Karnataka, India · ReNew Power
  18. Bhesada (Renew) wind farm—100MWPlant · Wind · India · Approximate location
  19. Nimbagallu (Renew) wind farm—100MWPlant · Wind · India · Approximate location · since 2016
  20. Taralkatti wind farm—100MWPlant · Wind · India · Approximate location · since 2018
  21. Bableshwar wind farm—90MWPlant · Wind · India · Approximate location · since 2017
  22. Jath (Renew) wind farm—85MWPlant · Wind · India · Approximate location · since 2012
  23. Molagavalli (Renew) wind farm—79MWPlant · Wind · India · Approximate location · since 2016
  24. Welturi wind farm—75MWPlant · Wind · India · since 2013
  25. Kushtagi (Renew) wind farm—71MWPlant · Wind · India · Approximate location · since 2018
  26. Code wind farm—61MWPlant · Wind · India · Approximate location
  27. Baturkhi wind farm—60MWPlant · Wind · India · Approximate location · since 2017
  28. Nirlooti wind farm—60MWPlant · Wind · India · Approximate location · since 2018
  29. Sattegiri wind farm—60MWPlant · Wind · India · Approximate location · since 2017
  30. Limbwas wind farm—54MWPlant · Wind · India · Approximate location
  31. Modha wind farm—52MWPlant · Wind · India · Approximate location
  32. Devgarh wind farm—51MWPlant · Wind · India · since 2015
  33. Kutch (Ostro) wind farm—50MWPlant · Wind · India · Approximate location · since 2022
  34. Bapuram wind farm—50MWPlant · Wind · India · Approximate location · since 2018
  35. Patan (Renew) wind farm—50MWPlant · Wind · India · Approximate location · since 2017
  36. Tejuva (Renew) wind farm—50MWPlant · Wind · India · Approximate location · since 2015
  37. Sadla (Renew) wind farm—48MWPlant · Wind · India · Approximate location · since 2017
  38. Molagavalli (Renew) II wind farm—46MWPlant · Wind · India · Approximate location · since 2017
  39. Lingasugur wind farm—40MWPlant · Wind · India · Approximate location · since 2015
  40. Nipaniya (Renew) wind farm—40MWPlant · Wind · India · since 2016
  41. Ron wind farm—40MWPlant · Wind · India · Approximate location · since 2016
  42. Mandsaur wind farm—36MWPlant · Wind · India
  43. Tadas (Renew) I wind farm—34MWPlant · Wind · India · Approximate location · since 2013
  44. Budh wind farm—30MWPlant · Wind · India · Approximate location · since 2014
  45. Dangri (Renew) wind farm—30MWPlant · Wind · India · since 2014
  46. Dewas Avp (Renew) wind farm—29MWPlant · Wind · India · Approximate location · since 2017
  47. Jamb wind farm—28MWPlant · Wind · India · since 2013
  48. Dewas Badoni (Renew) wind farm—27MWPlant · Wind · India · Approximate location · since 2017
  49. Rajgarh (Renew) I wind farm—26MWPlant · Wind · India · Approximate location
  50. Rajgarh (Renew) II wind farm—26MWPlant · Wind · India
All records in view, sorted by MW, descending
Hombal wind farm --ProjectUnder construction301MW——GEM
Kutch (Renew) II wind farmPlantOperating300MW— Approximate location—2021GEM
Maharashtra (Renew) wind farm --ProjectUnder construction300MW——GEM
SECI XI (Renew) wind farm --ProjectUnder construction300MW——GEM
Tondehal wind farm --ProjectUnder construction300MW——GEM
Kutch (Renew) I wind farmPlantOperating250MW— Approximate location2018GEM
Kutch (Renew) V wind farmPlantOperating250MW— Approximate location—2019GEM
Bellary-Devanagere SECI-6 (Ostro) wind farmPlantOperating199.5MW— Approximate location—2023GEM
Borampalli (Renew) wind farmPlantOperating197MW— Approximate location—2018GEM
Ralla wind farmPlantOperating197MW— Approximate location—2017GEM
Vaspet (Renew) wind farmPlantOperating144MW— Approximate location2013GEM
Ellutala wind farmPlantOperating132MW— Approximate location—2016GEM
Bhakrani (CLP) wind farmPlantOperating118MW——2013GEM
Amba (Renew) wind farmPlantOperating118MW— Approximate location—2016GEM
Lahori (Renew) wind farmPlantOperating118MW— Approximate location—2016GEM
Veerabhadra wind farmPlantOperating101MW— Approximate location—2017GEM
Bellary-Devanagere SECI-6 (Ostro) wind farm 2ProjectPlanned100.5MW——GEM
Bhesada (Renew) wind farmPlantOperating100MW— Approximate location——GEM
Nimbagallu (Renew) wind farmPlantOperating100MW— Approximate location—2016GEM
Taralkatti wind farmPlantOperating100MW— Approximate location—2018GEM
Bableshwar wind farmPlantOperating90MW— Approximate location—2017GEM
Jath (Renew) wind farmPlantOperating85MW— Approximate location—2012GEM
Molagavalli (Renew) wind farmPlantOperating79MW— Approximate location—2016GEM
Welturi wind farmPlantOperating75MW——2013GEM
Kushtagi (Renew) wind farmPlantOperating71MW— Approximate location—2018GEM
Code wind farmPlantOperating61MW— Approximate location——GEM
Baturkhi wind farmPlantOperating60MW— Approximate location—2017GEM
Nirlooti wind farmPlantOperating60MW— Approximate location—2018GEM
Sattegiri wind farmPlantOperating60MW— Approximate location—2017GEM
Limbwas wind farmPlantOperating54MW— Approximate location——GEM
Modha wind farmPlantOperating52MW— Approximate location——GEM
Devgarh wind farmPlantOperating51MW——2015GEM
Kutch (Ostro) wind farmPlantOperating50MW— Approximate location—2022GEM
Bapuram wind farmPlantOperating50MW— Approximate location—2018GEM
Patan (Renew) wind farmPlantOperating50MW— Approximate location—2017GEM
Tejuva (Renew) wind farmPlantOperating50MW— Approximate location—2015GEM
Sadla (Renew) wind farmPlantOperating48MW— Approximate location—2017GEM
Molagavalli (Renew) II wind farmPlantOperating46MW— Approximate location—2017GEM
Lingasugur wind farmPlantOperating40MW— Approximate location—2015GEM
Nipaniya (Renew) wind farmPlantOperating40MW——2016GEM
Ron wind farmPlantOperating40MW— Approximate location—2016GEM
Mandsaur wind farmPlantOperating36MW———GEM
Tadas (Renew) I wind farmPlantOperating34MW— Approximate location—2013GEM
Budh wind farmPlantOperating30MW— Approximate location—2014GEM
Dangri (Renew) wind farmPlantOperating30MW——2014GEM
Dewas Avp (Renew) wind farmPlantOperating29MW— Approximate location—2017GEM
Jamb wind farmPlantOperating28MW——2013GEM
Dewas Badoni (Renew) wind farmPlantOperating27MW— Approximate location—2017GEM
Rajgarh (Renew) I wind farmPlantOperating26MW— Approximate location——GEM
Rajgarh (Renew) II wind farmPlantOperating26MW———GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions