US energy projects and power plants, from first filing to retirement.
Public records, free to use. Every record links to its source.
| Stage | Sites | GW | No MW |
|---|---|---|---|
| Planned | 5 | 0.1 | 0 |
| Under construction | 4 | 0.2 | 0 |
| Operating | 48 | 2.0 | 0 |
| Idling or retired | 0 | 0 | 0 |
Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.
Loads · GW demand by tier, never summed
Sites hidden
- Talayuela (Solarcentury) solar farm—300MW
- Bartow (Encavis) solar farm—262.6MW
- Vlagtwedde solar farm—110MW
- Nørhede-Hjortmose (AURA Energi) wind farm—72MW
- Rødby Fjord solar farm—71MW
- Telšiai (Encavis) wind farm—69MW
- PVA Borrentin Nord solar farm—59.2MW
- Archidona (Encavis) solar farm—56.3MW
- PVA Borrentin Süd solar farm—55MW
- Cerrado Cabrera solar farm—50MW
- El Primo Aleman solar farm—50MW
- Hazas de las Sesenta solar farm—50MW
- Los Gonzalez solar farm—50MW
- Nrystar Budel solar farm—44MW
- Merkur solar farm—39MW
- Ooltgensplaat solar farm—37.6MW
- Svinningegarden solar farm—34MW
- Lemsterhoek solar farm—31MW
- Vognkær wind farm—30MW
- Glenay wind farm—30MW
- Gieboldehausen wind farm—29MW
- Apeldoorn Beemte-Broekland solar farm—27.6MW
- Groß Behnitz solar farm—25.3MW
- Müggenburg-Panschow wind farm—23MW
- Saukkovaara wind farm—23MW
- La Brousse-Bagnizeau wind farm—22.1MW
- Auras wind farm—22MW
- Groningen Airport Eelde solar farm—21.8MW
- Saturn solar farm—21.6MW
- Freiensteinau wind farm—21MW
- Herrenstein wind farm—20MW
- Bergheim wind farm—19MW
- Breberen wind farm—18MW
- Les Landes wind farm—18MW
- Furstkogel wind farm—17MW
- Fischbeck (Encavis) wind farm—15MW
- Dokkum solar farm—14MW
- Leigné-Les-Bois wind farm—14MW
- Mannhagen-Bälau wind farm—14MW
- Schönefeld wind farm—13MW
- Clementine wind farm—12MW
- Les Caves wind farm—12MW
- Bois-Gautier wind farm—12MW
- Fresnes En Saulnois wind farm—12MW
- Chenu wind farm—11MW
- Kümper wind farm—10MW
- Sefeosc wind farm—10MW
- Hoogengraven solar farm—3MW
| Talayuela (Solarcentury) solar farm | Plant | Operating | 300MW | — | 2020 | GEM | |||
| Bartow (Encavis) solar farm | Plant | Operating | 262.6MW | — | — | 2025 | GEM | ||
| Vlagtwedde solar farm | Plant | Operating | 110MW | — | — | 2020 | GEM | ||
| Nørhede-Hjortmose (AURA Energi) wind farm | Plant | Operating | 72MW | — | 2013 | GEM | |||
| Rødby Fjord solar farm | Plant | Operating | 71MW | — | Approximate location | 2022 | GEM | ||
| Telšiai (Encavis) wind farm | Plant | Operating | 69MW | — | Approximate location | 2021 | GEM | ||
| PVA Borrentin Nord solar farm | Plant | Operating | 59.2MW | — | — | 2024 | GEM | ||
| Archidona (Encavis) solar farm | Plant | Operating | 56.3MW | — | Approximate location | — | — | GEM | |
| PVA Borrentin Süd solar farm | Plant | Operating | 55MW | — | — | 2024 | GEM | ||
| Cerrado Cabrera solar farm | Plant | Operating | 50MW | — | 2020 | GEM | |||
| El Primo Aleman solar farm | Plant | Operating | 50MW | — | 2020 | GEM | |||
| Hazas de las Sesenta solar farm | Plant | Operating | 50MW | — | 2020 | GEM | |||
| Los Gonzalez solar farm | Plant | Operating | 50MW | — | 2020 | GEM | |||
| Nrystar Budel solar farm | Plant | Operating | 44MW | — | — | 2018 | GEM | ||
| Merkur solar farm | Plant | Operating | 39MW | — | Approximate location | — | 2021 | GEM | |
| Ooltgensplaat solar farm | Plant | Operating | 37.6MW | — | — | 2019 | GEM | ||
| Svinningegarden solar farm | Plant | Operating | 34MW | — | Approximate location | 2021 | GEM | ||
| Lemsterhoek solar farm | Plant | Operating | 31MW | — | 2022 | GEM | |||
| Vognkær wind farm | Plant | Operating | 30MW | — | — | 2010 | GEM | ||
| Glenay wind farm | Plant | Operating | 30MW | — | 2016 | GEM | |||
| Gieboldehausen wind farm | Plant | Operating | 29MW | — | 2019 | GEM | |||
| Apeldoorn Beemte-Broekland solar farm | Plant | Operating | 27.6MW | — | — | 2020 | GEM | ||
| Groß Behnitz solar farm | Plant | Operating | 25.3MW | — | 2021 | GEM | |||
| Müggenburg-Panschow wind farm | Plant | Operating | 23MW | — | — | 2001 | GEM | ||
| Saukkovaara wind farm | Plant | Operating | 23MW | — | 2016 | GEM | |||
| La Brousse-Bagnizeau wind farm | Plant | Operating | 22.1MW | — | Approximate location | 2022 | GEM | ||
| Auras wind farm | Plant | Operating | 22MW | — | 2022 | GEM | |||
| Groningen Airport Eelde solar farm | Plant | Operating | 21.8MW | — | — | 2020 | GEM | ||
| Saturn solar farm | Plant | Operating | 21.6MW | — | — | 2022 | GEM | ||
| Freiensteinau wind farm | Plant | Operating | 21MW | — | 2014 | GEM | |||
| Herrenstein wind farm | Plant | Operating | 20MW | — | 2017 | GEM | |||
| Bergheim wind farm | Plant | Operating | 19MW | — | 2003 | GEM | |||
| Breberen wind farm | Plant | Operating | 18MW | — | Approximate location | 2005 | GEM | ||
| Les Landes wind farm | Plant | Operating | 18MW | — | 2019 | GEM | |||
| Furstkogel wind farm | Plant | Operating | 17MW | — | 2019 | GEM | |||
| Fischbeck (Encavis) wind farm | Plant | Operating | 15MW | — | 2002 | GEM | |||
| Dokkum solar farm | Plant | Operating | 14MW | — | Approximate location | 2022 | GEM | ||
| Leigné-Les-Bois wind farm | Plant | Operating | 14MW | — | — | — | GEM | ||
| Mannhagen-Bälau wind farm | Plant | Operating | 14MW | — | 2002 | GEM | |||
| Schönefeld wind farm | Plant | Operating | 13MW | — | Approximate location | 2020 | GEM | ||
| Clementine wind farm | Plant | Operating | 12MW | — | 2015 | GEM | |||
| Les Caves wind farm | Plant | Operating | 12MW | — | 2019 | GEM | |||
| Bois-Gautier wind farm | Plant | Operating | 12MW | — | 2020 | GEM | |||
| Fresnes En Saulnois wind farm | Plant | Operating | 12MW | — | 2008 | GEM | |||
| Chenu wind farm | Plant | Operating | 11MW | — | Approximate location | — | — | GEM | |
| Kümper wind farm | Plant | Operating | 10MW | — | Approximate location | 2002 | GEM | ||
| Sefeosc wind farm | Plant | Operating | 10MW | — | 2009 | GEM | |||
| Hoogengraven solar farm | Plant | Operating | 3MW | — | Approximate location | 2020 | GEM |
Generation ·
What is counted
- Counts follow the map: move it or pick a state.
- Planned and Construction: every project a register still lists.
- Withdrawn and canceled: not counted or drawn; each keeps its own page.
- Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
- No stage chosen: all stages together, retired plants left out.
- Built projects are drawn among the plants, never counted twice.
- Not on this map: projects placed only by county or state, or with the site withheld by license.
- They are counted, not drawn, once the view holds that whole area.
- Data center MW is demand, never added to generation.
Generation
Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.
Under Color: Utilization, the least-run plants for their technology are darkest.
Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.
Power lines Partial coverage
Transmission lines by voltage.
OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.
© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)
Substations
Zoom in to see substations.
OpenStreetMap, where loaded (Texas for now).
© OpenStreetMap contributors (ODbL)
Pipelines
Pipelines by product, and the facilities along them.
EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.
EIA (public domain)
Power prices
Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Commercial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Residential. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.
Wholesale. Energy price only: no delivery, capacity or demand charges. California ISO and Western EIM areas only.
Sites
Plants, projects and data centers. Turn off to see only the layers.
Fiber by county
Availability by county, not routes.
Unshaded: not stated.
Fiber providers (county, approx.). Providers reporting fiber availability somewhere in the county. Not a route to a site, not carrier-neutral or long-haul fiber.
Download grid data
- Power lines 203,951 rows · 68 MB
- Substations 69,120 rows · 7 MB
GeoParquet · snapshot Oct 10, 2026
© OpenStreetMap contributors, ODbL. A database you derive from these files must stay under ODbL.
Convert to GeoJSON or Shapefile:ogr2ogr -f GeoJSON lines.geojson lines.parquetogr2ogr -f 'ESRI Shapefile' lines.shp lines.parquet
Transmission lines layer: LBNL download page, Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0.