Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned122.00
Under construction000
Operating301.50
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. Nudo Mudéjar de Andorra solar farm Calandrias—480.6MWProject · Solar · Aragón, Spain · Endesa SA
  2. Pego Hybrid solar farm --—365MWProject · Solar · Santarém, Portugal · Endesa SA
  3. Nudo Mudéjar de Andorra solar farm San Martín—250.6MWProject · Solar · Aragón, Spain · Endesa SA
  4. Andrea solar farm --—250MWProject · Solar · Andalucía, Spain · Endesa SA
  5. Nudo Mudéjar de Andorra solar farm Regallo—174MWProject · Solar · Aragón, Spain · Endesa SA
  6. Euder solar farm—129MWPlant · Solar · Spain · since 2019 · Enel Green Power
  7. Rocinante solar farm --—106.5MWProject · Solar · Castilla-La Mancha, Spain · Endesa SA
  8. Nudo Mudéjar de Andorra solar farm Santa Maria—99.4MWProject · Solar · Aragón, Spain · Endesa SA
  9. La Vega solar farm—86MWPlant · Solar · Spain · since 2020 · Enel Green Power España
  10. Totana solar farm—85MWPlant · Solar · Spain · since 2019 · Enel Green Power España
  11. Nudo Mudéjar de Andorra solar farm El Tambor—75MWProject · Solar · Aragón, Spain · Endesa SA
  12. Nudo Mudéjar de Andorra solar farm San Macario—74.2MWProject · Solar · Aragón, Spain · Endesa SA
  13. Tico solar farm—63.8MWPlant · Solar · Spain · since 2022
  14. Gamonarejo 36 solar farm—50MWPlant · Solar · Spain · since 2019 · Endesa
  15. Apicio solar farm—50MWPlant · Solar · Spain · since 2021 · Enel Green Power
  16. Beturia solar farm—50MWPlant · Solar · Spain · since 2021 · Enel Green Power
  17. Nertóbriga solar farm—50MWPlant · Solar · Spain · since 2021 · Enel Green Power
  18. Ardila solar farm—50MWPlant · Solar · Spain · since 2021 · Enel Green Power
  19. Cincinato solar farm—50MWPlant · Solar · Spain · since 2021 · Enel Green Power
  20. Veracruz solar farm—50MWPlant · Solar · Spain · Enel Green Power
  21. Puerta Palma solar farm—50MWPlant · Solar · Spain · Enel Green Power
  22. El Doblón solar farm—50MWPlant · Solar · Spain · Enel Green Power
  23. Augusto solar farm—50MWPlant · Solar · Spain · since 2020 · Enel Green Power España
  24. Sol De Casaquemada solar farm—50MWPlant · Solar · Spain · since 2022 · Enel Green Power España
  25. Las Corchas solar farm—50MWPlant · Solar · Spain · since 2020 · Enel Green Power España
  26. Los Naranjos solar farm—50MWPlant · Solar · Spain · since 2020 · Enel Green Power España
  27. Ríotinto solar farm --—50MWProject · Solar · Andalucía, Spain · Endesa SA
  28. Nudo Mudéjar de Andorra solar farm Calanda—49.9MWProject · Solar · Aragón, Spain · Endesa SA
  29. Tierra de Badajoz solar farm—48.8MWPlant · Solar · Spain · since 2022
  30. Mudéjar solar farm—47.6MWPlant · Solar · Spain · since 2025 · Enel Green Power España
  31. Agripa solar farm—45.3MWPlant · Solar · Spain · since 2022
  32. Alaudae solar farm—45.3MWPlant · Solar · Spain · since 2022
  33. Gemina solar farm—45.3MWPlant · Solar · Spain · since 2022
  34. Torrecilla solar farm—42MWPlant · Solar · Spain · Olivum PV Farm 01
  35. Alto do Rabagao Floating solar farm --—42MWProject · Solar · Vila Real, Portugal · Endesa SA
  36. Sedéis solar farm—37.5MWPlant · Solar · Spain · since 2023 · Enel Green Power España
  37. Encina del Sol solar farm—35.8MWPlant · Solar · Spain · since 2024 · Enel Green Power España
  38. Estrella Solar PV solar farm—35.8MWPlant · Solar · Spain · since 2023 · Enel Green Power España
  39. Torrepalma solar farm—22MWPlant · Solar · Spain · since 2021 · Enel Green Power
  40. Sa Caseta solar farm—21.8MWPlant · Solar · Spain · Endesa
  41. Biniatria solar farm—12.6MWPlant · Solar · Spain · Endesa
  42. Son Reus solar farm—10.7MWPlant · Solar · Spain · Endesa
All records in view, sorted by MW, descending
Nudo Mudéjar de Andorra solar farm CalandriasProjectPlanned480.6MW——GEM
Pego Hybrid solar farm --ProjectPlanned365MW——GEM
Nudo Mudéjar de Andorra solar farm San MartínProjectPlanned250.6MW——GEM
Andrea solar farm --ProjectPlanned250MW——GEM
Nudo Mudéjar de Andorra solar farm RegalloProjectPlanned174MW——GEM
Euder solar farmPlantOperating129MW—2019GEM
Rocinante solar farm --ProjectPlanned106.5MW——GEM
Nudo Mudéjar de Andorra solar farm Santa MariaProjectPlanned99.4MW——GEM
La Vega solar farmPlantOperating86MW—2020GEM
Totana solar farmPlantOperating85MW—2019GEM
Nudo Mudéjar de Andorra solar farm El TamborProjectPlanned75MW——GEM
Nudo Mudéjar de Andorra solar farm San MacarioProjectPlanned74.2MW——GEM
Tico solar farmPlantOperating63.8MW——2022GEM
Gamonarejo 36 solar farmPlantOperating50MW—2019GEM
Apicio solar farmPlantOperating50MW—2021GEM
Beturia solar farmPlantOperating50MW—2021GEM
Nertóbriga solar farmPlantOperating50MW—2021GEM
Ardila solar farmPlantOperating50MW—2021GEM
Cincinato solar farmPlantOperating50MW—2021GEM
Veracruz solar farmPlantOperating50MW——GEM
Puerta Palma solar farmPlantOperating50MW——GEM
El Doblón solar farmPlantOperating50MW——GEM
Augusto solar farmPlantOperating50MW—2020GEM
Sol De Casaquemada solar farmPlantOperating50MW—2022GEM
Las Corchas solar farmPlantOperating50MW—2020GEM
Los Naranjos solar farmPlantOperating50MW—2020GEM
Ríotinto solar farm --ProjectPlanned50MW——GEM
Nudo Mudéjar de Andorra solar farm CalandaProjectPlanned49.9MW——GEM
Tierra de Badajoz solar farmPlantOperating48.8MW——2022GEM
Mudéjar solar farmPlantOperating47.6MW—2025GEM
Agripa solar farmPlantOperating45.3MW——2022GEM
Alaudae solar farmPlantOperating45.3MW——2022GEM
Gemina solar farmPlantOperating45.3MW——2022GEM
Torrecilla solar farmPlantOperating42MW——GEM
Alto do Rabagao Floating solar farm --ProjectPlanned42MW——GEM
Sedéis solar farmPlantOperating37.5MW—2023GEM
Encina del Sol solar farmPlantOperating35.8MW—2024GEM
Estrella Solar PV solar farmPlantOperating35.8MW—2023GEM
Torrepalma solar farmPlantOperating22MW—2021GEM
Sa Caseta solar farmPlantOperating21.8MW——GEM
Biniatria solar farmPlantOperating12.6MW——GEM
Son Reus solar farmPlantOperating10.7MW——GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions