Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned242.90
Under construction000
Operating80.20
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. Pego Hybrid wind farm --—264MWProject · Wind · Portugal · Endesa SA
  2. As Pontes (Endesa) wind farm Future Phase 1—181MWProject · Wind · Spain · Endesa SA
  3. As Pontes (Endesa) wind farm Future Phase 2—181MWProject · Wind · Spain · Endesa SA
  4. As Pontes (Endesa) wind farm Future Phase 3—181MWProject · Wind · Spain · Endesa SA
  5. As Pontes (Endesa) wind farm Future Phase 5—181MWProject · Wind · Spain · Endesa SA
  6. As Pontes (Endesa) wind farm Future Phase 4—181MWProject · Wind · Spain · Endesa SA
  7. As Pontes (Endesa) wind farm Future Phase 6—181MWProject · Wind · Spain · Endesa SA
  8. Nudo Mudéjar de Andorra wind farm Empeltre—173.6MWProject · Wind · Aragón, Spain · Endesa SA
  9. Plan Futuro Andorra wind farm Empeltre—173.6MWProject · Wind · Spain · Endesa SA
  10. Nudo Mudéjar de Andorra wind farm Alcor—111.6MWProject · Wind · Aragón, Spain · Endesa SA
  11. Nudo Mudéjar de Andorra wind farm Castillo—111.6MWProject · Wind · Aragón, Spain · Endesa SA
  12. Plan Futuro Andorra wind farm Alcor—111.6MWProject · Wind · Spain · Endesa SA
  13. Plan Futuro Andorra wind farm Castillo—111.6MWProject · Wind · Spain · Endesa SA
  14. Nudo Mudéjar de Andorra wind farm Pitarra—108MWProject · Wind · Aragón, Spain · Endesa SA
  15. Plan Futuro Andorra wind farm Pitarra—108MWProject · Wind · Spain · Endesa SA
  16. Nudo Mudéjar de Andorra wind farm La Plana—86.8MWProject · Wind · Aragón, Spain · Endesa SA
  17. Plan Futuro Andorra wind farm La Plana—86.8MWProject · Wind · Spain · Endesa SA
  18. Molinaseca wind farm --—60MWProject · Wind · Castilla y León, Spain · Endesa SA
  19. Nudo Mudéjar de Andorra wind farm Ítaca—55.8MWProject · Wind · Aragón, Spain · Endesa SA
  20. Plan Futuro Andorra wind farm Itaca—55.8MWProject · Wind · Spain · Endesa SA
  21. San Cristóbal De Aguilón wind farm—50MWPlant · Wind · Spain · since 2011 · Aguilón 20
  22. Galatea wind farm --—48.9MWProject · Wind · Cataluña, Spain · Endesa SA
  23. Nudo Mudéjar de Andorra wind farm Torica—48MWProject · Wind · Aragón, Spain · Endesa SA
  24. Plan Futuro Andorra wind farm Torica—48MWProject · Wind · Spain · Endesa SA
  25. Castilfrío wind farm—25MWPlant · Wind · Spain · since 2003 · Compañía Eólica de Tierras Altas SA (CETASA)
  26. El Cayo wind farm—25MWPlant · Wind · Spain · since 2005 · Compañía Eólica de Tierras Altas SA (CETASA)
  27. Magaña wind farm—25MWPlant · Wind · Spain · since 2002 · Compañía Eólica de Tierras Altas SA (CETASA)
  28. Oncala wind farm—25MWPlant · Wind · Spain · since 2001 · Compañía Eólica de Tierras Altas SA (CETASA)
  29. Andorra wind farm --—20MWProject · Wind · Aragón, Spain · Endesa SA
  30. El Hierro Hidroeólico wind farm—12MWPlant · Wind · Spain · since 2014 · Gorona del Viento El Hierro
  31. Cañada Del Río wind farm—10MWPlant · Wind · Spain · since 1994
  32. Ambon wind farm (France)—10MWPlant · Wind · France · since 2008 · Société Nationale d'Electricité et de Thermique (SNET)
All records in view, sorted by MW, descending
Pego Hybrid wind farm --ProjectPlanned264MW——GEM
As Pontes (Endesa) wind farm Future Phase 1ProjectPlanned181MW——GEM
As Pontes (Endesa) wind farm Future Phase 2ProjectPlanned181MW——GEM
As Pontes (Endesa) wind farm Future Phase 3ProjectPlanned181MW——GEM
As Pontes (Endesa) wind farm Future Phase 5ProjectPlanned181MW——GEM
As Pontes (Endesa) wind farm Future Phase 4ProjectPlanned181MW——GEM
As Pontes (Endesa) wind farm Future Phase 6ProjectPlanned181MW——GEM
Nudo Mudéjar de Andorra wind farm EmpeltreProjectPlanned173.6MW——GEM
Plan Futuro Andorra wind farm EmpeltreProjectPlanned173.6MW——GEM
Nudo Mudéjar de Andorra wind farm AlcorProjectPlanned111.6MW——GEM
Nudo Mudéjar de Andorra wind farm CastilloProjectPlanned111.6MW——GEM
Plan Futuro Andorra wind farm AlcorProjectPlanned111.6MW——GEM
Plan Futuro Andorra wind farm CastilloProjectPlanned111.6MW——GEM
Nudo Mudéjar de Andorra wind farm PitarraProjectPlanned108MW——GEM
Plan Futuro Andorra wind farm PitarraProjectPlanned108MW——GEM
Nudo Mudéjar de Andorra wind farm La PlanaProjectPlanned86.8MW——GEM
Plan Futuro Andorra wind farm La PlanaProjectPlanned86.8MW——GEM
Molinaseca wind farm --ProjectPlanned60MW——GEM
Nudo Mudéjar de Andorra wind farm ÍtacaProjectPlanned55.8MW——GEM
Plan Futuro Andorra wind farm ItacaProjectPlanned55.8MW——GEM
San Cristóbal De Aguilón wind farmPlantOperating50MW—2011GEM
Galatea wind farm --ProjectPlanned48.9MW——GEM
Nudo Mudéjar de Andorra wind farm ToricaProjectPlanned48MW——GEM
Plan Futuro Andorra wind farm ToricaProjectPlanned48MW——GEM
Castilfrío wind farmPlantOperating25MW—2003GEM
El Cayo wind farmPlantOperating25MW—2005GEM
Magaña wind farmPlantOperating25MW—2002GEM
Oncala wind farmPlantOperating25MW—2001GEM
Andorra wind farm --ProjectPlanned20MW——GEM
El Hierro Hidroeólico wind farmPlantOperating12MW—2014GEM
Cañada Del Río wind farmPlantOperating10MW——1994GEM
Ambon wind farm (France)PlantOperating10MW—2008GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions