Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned212.50
Under construction000
Operating000
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. Frontera solar farm (Spain) 1—227MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
  2. Nita solar farm 1—208MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
  3. Guadarrama solar farm 3—179.9MWProject · Solar · Castilla-La Mancha, Spain · Compañía Española de Petróleos SA
  4. Sancho solar farm --—173MWProject · Solar · Andalucía, Spain · Compañía Española de Petróleos SA
  5. Arenales (Mitra) solar farm 3—145.2MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
  6. Castilla-La Mancha (Cespa) solar farm 1—133.3MWProject · Solar · Castilla-La Mancha, Spain · Compañía Española de Petróleos SA
  7. Castilla-La Mancha (Cespa) solar farm 3—133.3MWProject · Solar · Castilla-La Mancha, Spain · Compañía Española de Petróleos SA
  8. Castilla-La Mancha (Cespa) solar farm 2—133.3MWProject · Solar · Castilla-La Mancha, Spain · Compañía Española de Petróleos SA
  9. Arenales (Mitra) solar farm 1—113.3MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
  10. Arenales (Mitra) solar farm 2—112.5MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
  11. Guadarrama solar farm 1—104MWProject · Solar · Comunidad de Madrid, Spain · Compañía Española de Petróleos SA
  12. Herradura solar farm --—100MWProject · Solar · Andalucía, Spain · Compañía Española de Petróleos SA
  13. Cañaveral solar farm 2—95.9MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
  14. Nita solar farm 2—95MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
  15. Ronda solar farm 1—92.9MWProject · Solar · Andalucía, Spain · Compañía Española de Petróleos SA
  16. Ronda solar farm 2—92.9MWProject · Solar · Andalucía, Spain · Compañía Española de Petróleos SA
  17. Ronda solar farm 3—92.9MWProject · Solar · Andalucía, Spain · Compañía Española de Petróleos SA
  18. Cañaveral solar farm 1—73.2MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
  19. Guadarrama solar farm 2—71.1MWProject · Solar · Comunidad de Madrid, Spain · Compañía Española de Petróleos SA
  20. Cañaveral solar farm 3—63.5MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
  21. Cañaveral solar farm 4—63.4MWProject · Solar · Extremadura, Spain · Compañía Española de Petróleos SA
All records in view, sorted by MW, descending
Frontera solar farm (Spain) 1ProjectPlanned227MW——GEM
Nita solar farm 1ProjectPlanned208MW——GEM
Guadarrama solar farm 3ProjectPlanned179.9MW——GEM
Sancho solar farm --ProjectPlanned173MW——GEM
Arenales (Mitra) solar farm 3ProjectPlanned145.2MW——GEM
Castilla-La Mancha (Cespa) solar farm 1ProjectPlanned133.3MW——GEM
Castilla-La Mancha (Cespa) solar farm 3ProjectPlanned133.3MW——GEM
Castilla-La Mancha (Cespa) solar farm 2ProjectPlanned133.3MW——GEM
Arenales (Mitra) solar farm 1ProjectPlanned113.3MW——GEM
Arenales (Mitra) solar farm 2ProjectPlanned112.5MW——GEM
Guadarrama solar farm 1ProjectPlanned104MW——GEM
Herradura solar farm --ProjectPlanned100MW——GEM
Cañaveral solar farm 2ProjectPlanned95.9MW——GEM
Nita solar farm 2ProjectPlanned95MW——GEM
Ronda solar farm 1ProjectPlanned92.9MW——GEM
Ronda solar farm 2ProjectPlanned92.9MW——GEM
Ronda solar farm 3ProjectPlanned92.9MW——GEM
Cañaveral solar farm 1ProjectPlanned73.2MW——GEM
Guadarrama solar farm 2ProjectPlanned71.1MW——GEM
Cañaveral solar farm 3ProjectPlanned63.5MW——GEM
Cañaveral solar farm 4ProjectPlanned63.4MW——GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions