Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned4312.70
Under construction1<0.10
Operating10227.60
Idling or retired1113.80

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Sites hidden

  1. Gundremmingen nuclear power plant—2,938MWPlant · Nuclear · Germany · Retired 2021 · Kernkraftwerke Gundremmingen Betriebsgesellschaft; Kernkraftwerk Gundremmingen
  2. Biblis nuclear power plant—2,525MWPlant · Nuclear · Germany · Retired 2011 · RWE Power
  3. Frimmersdorf power station—2,506MWPlant · Coal · Germany · Retired 2021
  4. Aberthaw-B power station—1,725MWPlant · Coal · United Kingdom · Retired 2020
  5. Westfalen power station—1,435MWPlant · Coal · Germany · Retired 2021
  6. Emsland nuclear power plant—1,406MWPlant · Nuclear · Germany · Retired 2023 · Kernkraftwerke Lippe-Ems
  7. Ibbenbüren-B power station—838MWPlant · Coal · Germany · Retired 2021
  8. Koepchenwerk hydroelectric plant—132MWPlant · Pumped hydro storage · Germany · Retired 1994
  9. Dortmund CHP power plant—130MWPlant · Gas, combined cycle · Germany · Retired 2022
  10. Wachtberg power station—128MWPlant · Coal · Germany · Retired 2022
  11. Bergen op Zoom power station—34MWPlant · Gas, combined cycle · Netherlands · Retired 2020 · RWE Generation NL
Idling or retired plants in view, sorted by MW, descending
Gundremmingen nuclear power plantPlantRetired2,938MW—Retired 2021GEM
Biblis nuclear power plantPlantRetired2,525MW—Retired 2011GEM
Frimmersdorf power stationPlantRetired2,506MW——Retired 2021GEM
Aberthaw-B power stationPlantRetired1,725MW——Retired 2020GEM
Westfalen power stationPlantRetired1,435MW——Retired 2021GEM
Emsland nuclear power plantPlantRetired1,406MW—Retired 2023GEM
Ibbenbüren-B power stationPlantRetired838MW——Retired 2021GEM
Koepchenwerk hydroelectric plantPlantRetired132MW——Retired 1994GEM
Dortmund CHP power plantPlantRetired130MW——Retired 2022GEM
Wachtberg power stationPlantRetired128MW——Retired 2022GEM
Bergen op Zoom power stationPlantRetired34MW—Retired 2020GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions