Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned4312.70
Under construction1<0.10
Operating10227.60
Idling or retired1113.80

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Sites hidden

  1. Kent Offshore wind farm --—2,000MWProject · Offshore wind · Australia · RWE AG
  2. Sharco Duo Offshore wind farm --—1,800MWProject · Offshore wind · Pomeranian Voivodeship, Poland · RWE AG
  3. Freeboard I Offshore wind farm 1—1,500MWProject · Offshore wind · Poland · RWE AG
  4. Campbells Bridge wind farm --—1,000MWProject · Wind · Australia · RWE AG
  5. Voerde power station 1—850MWProject · Gas, combined cycle · Nordrhein-Westfalen, Germany · RWE AG
  6. Gersteinwerk power station CC1, timepoint 1—800MWProject · Gas, combined cycle · Nordrhein-Westfalen, Germany · RWE AG
  7. RWE Burghausen power station CC 1—800MWProject · Gas, combined cycle · Bayern, Germany · RWE AG
  8. Weisweiler power station CC, timepoint 1—800MWProject · Gas, combined cycle · Nordrhein-Westfalen, Germany · RWE Power AG
  9. Southern Queensland wind farm --—720MWProject · Wind · Queensland, Australia · RWE AG
  10. Delta Nordsee wind farm --—480MWProject · Offshore wind · Lower Saxony, Germany · RWE AG
  11. Nordsee 2 wind farm --—435MWProject · Offshore wind · Lower Saxony, Germany · RWE AG
  12. Nordsee 3 wind farm --—420MWProject · Offshore wind · Lower Saxony, Germany · RWE AG
  13. Nordsee 1 wind farm --—225MWProject · Offshore wind · Germany · RWE AG
  14. RWE Burghausen power station Peaker 1—150MWProject · Gas, combustion turbine · Bayern, Germany · RWE AG
  15. Gundremmingen power plant Peaker 1—124MWProject · Gas, other · Bayern, Germany · RWE Generation SE
  16. Nuisement Sur Coole wind farm --—63MWProject · Wind · Grand Est, France · RWE AG
  17. Vallée de l’Eaulne wind farm --—39.9MWProject · Wind · France · RWE AG
  18. Senan wind farm --—35.4MWProject · Wind · France · RWE AG
  19. Soudron Et Cheniers wind farm --—34MWProject · Wind · Grand Est, France · RWE AG
  20. Lingen power station 1—34MWProject · Gas, combustion turbine · Niedersachsen, Germany · RWE Generation SE
  21. Saint-Maur-sur-le-Loir wind farm --—33MWProject · Wind · France · RWE AG
  22. Canny wind farm --—28.5MWProject · Wind · Hauts-de-France, France · RWE AG
  23. Les Pressoirs wind farm --—28.5MWProject · Wind · France · RWE AG
  24. Saint-Ouen-le-Mauger wind farm --—28.5MWProject · Wind · France · RWE AG
  25. Raisinieres wind farm --—23MWProject · Wind · Centre-Loire Valley, France · RWE AG
  26. Chapelle-Sur-Chezy wind farm --—22.8MWProject · Wind · Hauts-de-France, France · RWE AG
  27. Pierre-Morains et Val-des-Marais wind farm --—22MWProject · Wind · France · RWE AG
  28. Balinot wind farm --—21.6MWProject · Wind · Hauts-de-France, France · RWE AG
  29. Quatre Jallois wind farm --—20.7MWProject · Wind · Hauts-de-France, France · RWE AG
  30. Cinq Poiriers wind farm --—19MWProject · Wind · Grand Est, France · RWE AG
  31. Athienville wind farm --—17.7MWProject · Wind · France · RWE AG
  32. Ailes du Gâtinais wind farm --—17.1MWProject · Wind · France · RWE AG
  33. Saint-Vaast-d'Equiqueville wind farm --—17.1MWProject · Wind · France · RWE AG
  34. Mesbrecourt-Richecourt wind farm --—16MWProject · Wind · Hauts-de-France, France · RWE AG
  35. Baumes wind farm --—13MWProject · Wind · Grand Est, France · RWE AG
  36. Mont Hellet wind farm --—13MWProject · Wind · Normandy, France · RWE AG
  37. Mont Herbe wind farm --—13MWProject · Wind · Hauts-de-France, France · RWE AG
  38. Chemin de Saint-Gilles wind farm --—12MWProject · Wind · France · RWE AG
  39. Langonnet wind farm --—12MWProject · Wind · France · RWE AG
  40. Morgat wind farm --—11.8MWProject · Wind · Nouvelle-Aquitaine, France · RWE AG
  41. Ban Saint-Jean wind farm --—11MWProject · Wind · Grand Est, France · RWE AG
  42. Chemin de Châlons wind farm --—11MWProject · Wind · Grand Est, France · RWE AG
  43. Paz'Eole wind farm --—11MWProject · Wind · Pays de la Loire, France · RWE AG
Planned projects in view, sorted by MW, descending
Kent Offshore wind farm --ProjectPlanned2,000MW——GEM
Sharco Duo Offshore wind farm --ProjectPlanned1,800MW——GEM
Freeboard I Offshore wind farm 1ProjectPlanned1,500MW——GEM
Campbells Bridge wind farm --ProjectPlanned1,000MW——GEM
Voerde power station 1ProjectPlanned850MW——GEM
Gersteinwerk power station CC1, timepoint 1ProjectPlanned800MW——GEM
RWE Burghausen power station CC 1ProjectPlanned800MW——GEM
Weisweiler power station CC, timepoint 1ProjectPlanned800MW——GEM
Southern Queensland wind farm --ProjectPlanned720MW——GEM
Delta Nordsee wind farm --ProjectPlanned480MW——GEM
Nordsee 2 wind farm --ProjectPlanned435MW——GEM
Nordsee 3 wind farm --ProjectPlanned420MW——GEM
Nordsee 1 wind farm --ProjectPlanned225MW——GEM
RWE Burghausen power station Peaker 1ProjectPlanned150MW——GEM
Gundremmingen power plant Peaker 1ProjectPlanned124MW——GEM
Nuisement Sur Coole wind farm --ProjectPlanned63MW——GEM
Vallée de l’Eaulne wind farm --ProjectPlanned39.9MW——GEM
Senan wind farm --ProjectPlanned35.4MW——GEM
Soudron Et Cheniers wind farm --ProjectPlanned34MW——GEM
Lingen power station 1ProjectPlanned34MW——GEM
Saint-Maur-sur-le-Loir wind farm --ProjectPlanned33MW——GEM
Canny wind farm --ProjectPlanned28.5MW——GEM
Les Pressoirs wind farm --ProjectPlanned28.5MW——GEM
Saint-Ouen-le-Mauger wind farm --ProjectPlanned28.5MW——GEM
Raisinieres wind farm --ProjectPlanned23MW——GEM
Chapelle-Sur-Chezy wind farm --ProjectPlanned22.8MW——GEM
Pierre-Morains et Val-des-Marais wind farm --ProjectPlanned22MW——GEM
Balinot wind farm --ProjectPlanned21.6MW——GEM
Quatre Jallois wind farm --ProjectPlanned20.7MW——GEM
Cinq Poiriers wind farm --ProjectPlanned19MW——GEM
Athienville wind farm --ProjectPlanned17.7MW——GEM
Ailes du Gâtinais wind farm --ProjectPlanned17.1MW——GEM
Saint-Vaast-d'Equiqueville wind farm --ProjectPlanned17.1MW——GEM
Mesbrecourt-Richecourt wind farm --ProjectPlanned16MW——GEM
Baumes wind farm --ProjectPlanned13MW——GEM
Mont Hellet wind farm --ProjectPlanned13MW——GEM
Mont Herbe wind farm --ProjectPlanned13MW——GEM
Chemin de Saint-Gilles wind farm --ProjectPlanned12MW——GEM
Langonnet wind farm --ProjectPlanned12MW——GEM
Morgat wind farm --ProjectPlanned11.8MW——GEM
Ban Saint-Jean wind farm --ProjectPlanned11MW——GEM
Chemin de Châlons wind farm --ProjectPlanned11MW——GEM
Paz'Eole wind farm --ProjectPlanned11MW——GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions