Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

Sites hidden

  1. Ras Ghareb wind farm—913MWPlant · Wind · Egypt · since 2019 · Toyota Tsusho; Eurus Energy Holdings; ENGIE; Orascom Construction; Red Sea Wind Energy S.A.E. (RSWE)
  2. Ashikawa wind farm—129MWPlant · Wind · Japan · since 2024
  3. Kawaminami wind farm—80MWPlant · Wind · Japan · since 2023
  4. Yuchi wind farm—72.2MWPlant · Wind · Japan · since 2025
  5. Kawanishi wind farm—64MWPlant · Wind · Japan · since 2024
  6. Hamasato wind farm—48MWPlant · Wind · Japan · since 2023
  7. Kabaoka wind farm—42MWPlant · Wind · Japan · since 2024
  8. Kamikatsu-Kamiyama wind farm—35MWPlant · Wind · Japan · since 2022 · Shimizu
  9. Sandai Myojin wind farm—34MWPlant · Wind · Japan · since 2024
  10. Samsu wind farm—21MWPlant · Wind · South Korea · since 2021
  11. Tomamae wind farm—20MWPlant · Wind · Japan · since 1999
  12. Tabito wind farm—19MWPlant · Wind · Japan · since 2023
  13. Date Kitakogane wind farm—13MWPlant · Wind · Japan · since 2023
  14. Mameda wind farm—11MWPlant · Wind · Japan · since 2003 · Eurus Energy
Operating plants in view, sorted by MW, descending
Ras Ghareb wind farmPlantOperating913MW—2019GEM
Ashikawa wind farmPlantOperating129MW——2024GEM
Kawaminami wind farmPlantOperating80MW——2023GEM
Yuchi wind farmPlantOperating72.2MW——2025GEM
Kawanishi wind farmPlantOperating64MW——2024GEM
Hamasato wind farmPlantOperating48MW——2023GEM
Kabaoka wind farmPlantOperating42MW——2024GEM
Kamikatsu-Kamiyama wind farmPlantOperating35MW—2022GEM
Sandai Myojin wind farmPlantOperating34MW——2024GEM
Samsu wind farmPlantOperating21MW——2021GEM
Tomamae wind farmPlantOperating20MW——1999GEM
Tabito wind farmPlantOperating19MW——2023GEM
Date Kitakogane wind farmPlantOperating13MW——2023GEM
Mameda wind farmPlantOperating11MW—2003GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions