Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned21.30
Under construction000
Operating107.30
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Sites hidden

  1. Lanxi power station—2,400MWPlant · Carbon capture (CCS) · China · since 2008
  2. Zhejiang Taizhou-1 power station—1,260MWPlant · Coal · China · since 1980
  3. Xiaoshan power station—1,220MWPlant · Gas, combined cycle · China · since 1992
  4. Aksu Cogen power station—700MWPlant · Coal · China · since 2016
  5. Tankeng hydroelectric plant—600MWPlant · Hydro · China · since 2009 · Zhejiang Zheneng Electric Power
  6. Zheneng Changshan Gas power station—458MWPlant · Gas, combined cycle · China · since 2014
  7. Xinjiang Kalpin (Zhejiang Energy) solar farm—370MWPlant · Solar · China · since 2025
  8. Zheneng Jinhua Gas power station—186MWPlant · Gas, combined cycle · China · since 2005
  9. Zhejiang Jiaxing thermal power plant Photovoltaic solar facility—30MWPlant · Solar · China · since 2017 · Zhejiang Zheneng Jiaxing Electricity Generation
  10. Zhejiang Beilun (Guodian) solar farm—30MWPlant · Solar · China · since 2020 · Guodian Zhejiang Beilun No.1 Power Generation
Operating plants in view, sorted by MW, descending
Lanxi power stationPlantOperating2,400MW——2008GEM
Zhejiang Taizhou-1 power stationPlantOperating1,260MW——1980GEM
Xiaoshan power stationPlantOperating1,220MW——1992GEM
Aksu Cogen power stationPlantOperating700MW——2016GEM
Tankeng hydroelectric plantPlantOperating600MW—2009GEM
Zheneng Changshan Gas power stationPlantOperating458MW——2014GEM
Xinjiang Kalpin (Zhejiang Energy) solar farmPlantOperating370MW——2025GEM
Zheneng Jinhua Gas power stationPlantOperating186MW——2005GEM
Zhejiang Jiaxing thermal power plant Photovoltaic solar facilityPlantOperating30MW—2017GEM
Zhejiang Beilun (Guodian) solar farmPlantOperating30MW—2020GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions