Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned2014.10
Under construction55.20
Operating1029.80
Idling or retired34.30

GW: generating and storage capacity stated in MW. Other: Nuclear, Coal, Hydro, Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Unspecified fuel. Loads are demand, never in GW.

Loads · GW demand by tier, never summed

Sites hidden

  1. Leningrad nuclear power plant—4,376MWPlant · Nuclear · Russia · since 1974 · Rosenergoatom
  2. Rostov nuclear power plant—4,071MWPlant · Nuclear · Russia · since 2001 · Rosenergoatom
  3. Balakovo nuclear power plant—4,000MWPlant · Nuclear · Russia · since 1986 · Rosenergoatom
  4. Kalinin nuclear power plant—4,000MWPlant · Nuclear · Russia · since 1985 · Rosenergoatom
  5. Novovoronezh nuclear power plant—3,778MWPlant · Nuclear · Russia · since 1964 · Rosenergoatom
  6. Kursk nuclear power plant—3,255MWPlant · Nuclear · Russia · since 1977 · Rosenergoatom
  7. Smolensk nuclear power plant—3,000MWPlant · Nuclear · Russia · since 1983 · Rosenergoatom
  8. Kola nuclear power plant—1,760MWPlant · Nuclear · Russia · since 1973 · Rosenergoatom
  9. Beloyarsk nuclear power plant—1,485MWPlant · Nuclear · Russia · since 1964 · Rosenergoatom
  10. Akademik Lomonosov nuclear power plant—70MWPlant · Nuclear · Russia · since 2020 · Rosenergoatom
Operating plants in view, sorted by MW, descending
Leningrad nuclear power plantPlantOperating4,376MW—1974GEM
Rostov nuclear power plantPlantOperating4,071MW—2001GEM
Balakovo nuclear power plantPlantOperating4,000MW—1986GEM
Kalinin nuclear power plantPlantOperating4,000MW—1985GEM
Novovoronezh nuclear power plantPlantOperating3,778MW—1964GEM
Kursk nuclear power plantPlantOperating3,255MW—1977GEM
Smolensk nuclear power plantPlantOperating3,000MW—1983GEM
Kola nuclear power plantPlantOperating1,760MW—1973GEM
Beloyarsk nuclear power plantPlantOperating1,485MW—1964GEM
Akademik Lomonosov nuclear power plantPlantOperating70MW—2020GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions