Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

StageSitesGWNo MW
Planned000
Under construction000
Operating211.70
Idling or retired000

Generating and storage capacity as stated, in MW, or in GW above 1,000 MW. Other: Oil, CO2 storage, Bioenergy, Geothermal, Hydrogen, Grid and pipelines, Unspecified fuel. Loads are demand, never in these figures.

Loads · GW demand by tier, never summed

Powered sites BetaIdle and underused plants on a live grid connection, with the nearest line and substation. Free.

Sites hidden

  1. Clyde wind farm—522.8MWPlant · Wind · United Kingdom · since 2012 · Scottish and Southern Energy (SSE)
  2. Stronelairg wind farm—227.7MWPlant · Wind · United Kingdom · since 2018 · Scottish and Southern Energy (SSE)
  3. Hadyard Hill wind farm—120MWPlant · Wind · United Kingdom · since 2006 · Scottish and Southern Energy (SSE)
  4. Bhlaraidh wind farm—110MWPlant · Wind · United Kingdom · since 2017 · Scottish and Southern Energy (SSE)
  5. Dunmaglass wind farm—94MWPlant · Wind · United Kingdom · since 2016 · Scottish and Southern Energy (SSE)
  6. Gordonbush wind farm—70MWPlant · Wind · United Kingdom · since 2012 · Scottish and Southern Energy (SSE)
  7. Keadby wind farm—68MWPlant · Wind · United Kingdom · since 2015 · Scottish and Southern Energy (SSE)
  8. Strathy wind farm—67.7MWPlant · Wind · United Kingdom · since 2015 · Scottish and Southern Energy (SSE)
  9. Skelton Grange power station—50MWPlant · Biomass · United Kingdom · since 2025 · Scottish and Southern Energy (SSE)
  10. Slough Multifuel power station—50MWPlant · Biomass · United Kingdom · since 2024 · Scottish and Southern Energy (SSE)
  11. Slieve Divena wind farm—48.8MWPlant · Wind · United Kingdom · since 2009 · Greencoat UK Wind; Scottish and Southern Energy (SSE)
  12. Glenconway wind farm—46MWPlant · Wind · United Kingdom · since 2013 · Scottish and Southern Energy (SSE)
  13. Fairburn wind farm—43MWPlant · Wind · United Kingdom · since 2010 · Scottish and Southern Energy (SSE)
  14. Achany wind farm—38MWPlant · Wind · United Kingdom · since 2010 · Scottish and Southern Energy (SSE)
  15. Drumderg wind farm—36.8MWPlant · Wind · United Kingdom · since 2008 · Scottish and Southern Energy (SSE)
  16. Tievenameenta wind farm—34.5MWPlant · Wind · United Kingdom · since 2017 · Scottish and Southern Energy (SSE)
  17. Calliachar wind farm—32.2MWPlant · Wind · United Kingdom · since 2013 · Scottish and Southern Energy (SSE)
  18. Toddleburn wind farm—27.6MWPlant · Wind · United Kingdom · since 2010 · Scottish and Southern Energy (SSE)
  19. Artfield Fell wind farm—19.5MWPlant · Wind · United Kingdom · since 2005 · Scottish and Southern Energy (SSE)
  20. Tangy wind farm—18.8MWPlant · Wind · United Kingdom · since 2002 · Border Winds; Scottish and Southern Energy (SSE)
  21. Spurness wind farm—10MWPlant · Wind · United Kingdom · since 2004 · Scottish and Southern Energy (SSE)
All records in view, sorted by MW, descending
Clyde wind farmPlantOperating522.8MW—2012GEM
Stronelairg wind farmPlantOperating227.7MW—2018GEM
Hadyard Hill wind farmPlantOperating120MW—2006GEM
Bhlaraidh wind farmPlantOperating110MW—2017GEM
Dunmaglass wind farmPlantOperating94MW—2016GEM
Gordonbush wind farmPlantOperating70MW—2012GEM
Keadby wind farmPlantOperating68MW—2015GEM
Strathy wind farmPlantOperating67.7MW—2015GEM
Skelton Grange power stationPlantOperating50MW—2025GEM
Slough Multifuel power stationPlantOperating50MW—2024GEM
Slieve Divena wind farmPlantOperating48.8MW—2009GEM
Glenconway wind farmPlantOperating46MW—2013GEM
Fairburn wind farmPlantOperating43MW—2010GEM
Achany wind farmPlantOperating38MW—2010GEM
Drumderg wind farmPlantOperating36.8MW—2008GEM
Tievenameenta wind farmPlantOperating34.5MW—2017GEM
Calliachar wind farmPlantOperating32.2MW—2013GEM
Toddleburn wind farmPlantOperating27.6MW—2010GEM
Artfield Fell wind farmPlantOperating19.5MW—2005GEM
Tangy wind farmPlantOperating18.8MW—2002GEM
Spurness wind farmPlantOperating10MW—2004GEM

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Utilization, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices

Industrial. Delivered price: average revenue per MWh, not a tariff quote. Median of the county's utilities.

Sources and licenses · Reuse conditions

Sites

Plants, projects and data centers. Turn off to see only the layers.

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions