Partial coverage
Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

  1. Project Matador Nuclear—4,468MWProject · Nuclear · Carson, TX · due Dec 2031 · Fermi Nuclear
  2. Homer City Generating Station—4,396MWProject · Gas, combined cycle · Indiana, PA · due Nov 2029 · Homer City Generation, L.P.
  3. Atlas Complex—3,200MWProject · Solar + storage · LA PAZ, AZ · due Mar 2028
  4. Brazos Energy Security—2,992MWProject · Gas, combined cycle · Fisher, TX · due Sep 2030 · Golden Spread Electric
  5. Schahfer CCGTs (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—2,739.8MWProject · Gas, other · Jasper, IN · due Aug 2028 · NIPSCO
  6. Pepper Hammock Solar and Storage—2,500MWProject · Solar + storage · Wayne, GA · due Sep 2029 · BrightNight Power
  7. Sunstone Solar—2,400MWProject · Solar + storage · Morrow, OR · due Dec 2027 · Sunstone Solar, LLC
  8. Pointe Coupee Power Station—2,340.9MWProject · Gas, combined cycle · Pointe Coupee, LA · due Oct 2031 · Entergy Louisiana LLC
  9. J3996 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—2,220MWProject · Gas, other · St. Charles, MO · due Jan 2030
  10. Deschutes Solar and BESS—2,000MWProject · Solar + storage · Wasco, OR · due Nov 2029 · DECH bn, LLC
  11. Q255—2,000MWProject · Solar + storage · Coconino, AZ · due Dec 2021
  12. Smarr CC—2,000MWProject · Gas, other · Monroe, GA · due Mar 2028
  13. G0822—2,000MWProject · Solar + storage · Benton, WA · due Dec 2026
  14. BM Great Rock Energy Center—1,981.2MWProject · Gas, combined cycle · Leon, TX · due May 2029 · Black Mountain Energy Storage II
  15. Kingston—1,830.6MWProject · Gas, combined cycle · Roane, TN · due Dec 2027 · Tennessee Valley Authority
  16. 489—1,689MWProject · Gas, other · Roane, TN · due Jun 2026
  17. Prairie Ridge (Gas - CC)—1,660.4MWProject · Gas, combined cycle · Franklin, TX · due Jun 2032 · Tenaska Power Generation, LLC
  18. Sawtooth DevCo, LLC—1,650MWProject · Solar + storage · Jerome, ID · due Dec 2027 · Sawtooth DevCo, LLC
  19. Sawtooth DevCo, LLC—1,650MWProject · Solar + storage · Owyhee, ID · due Dec 2027 · Sawtooth DevCo, LLC
  20. Q92—1,650MWProject · Solar + storage · San Bernardino, CA · due Dec 2025
  21. Franklin Farms 1&2 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,640MWProject · Gas, other · Richland, LA · due Aug 2028 · Entergy Louisiana LLC
  22. Richland Parish Power Station 1&2 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,640MWProject · Gas, other · Richland, LA · due Aug 2028 · Entergy Louisiana LLC
  23. 977726—1,620MWProject · Gas, other · Rowan, NC
  24. 483—1,600MWProject · Gas, other · Stewart, TN · due Oct 2025
  25. 620—1,600MWProject · Gas, other · Trousdale, TN · due Jun 2031
  26. 628—1,600MWProject · Gas, other · Todd, KY · due Jun 2030
  27. Hecate Energy Orem Wind—1,542MWProject · Wind · Brazoria, TX · due Jun 2030 · Hecate Energy LLC
  28. J3999 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,540MWProject · Gas, other · Vermillion, IN · due Jan 2030
  29. Aegle Power—1,536.4MWProject · Gas, combined cycle · Cameron, TX · due Jul 2027 · Coronado Power Ventures LLC
  30. Bison Generation Station—1,518MWProject · Gas, combined cycle · Williams, ND · due Feb 2029 · Basin Electric Power Coop
  31. Big Canyon Wind—1,500MWProject · Wind · Pecos, TX · due Jul 2030 · Longfellow Wind, LLC
  32. Caldwell County Energy Center—1,500MWProject · Gas, combined cycle · Caldwell, TX · due Apr 2030 · Caldwell County Energy Center, LLC
  33. Holman—1,500MWProject · Wind + storage · MONTEREY, CA · due Feb 2034
  34. Q320—1,500MWProject · Wind · San Juan, NM · due Sep 2026
  35. Q98—1,500MWProject · Solar + storage · Los Angeles, CA · due Nov 2030
  36. J4071 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,500MWProject · Gas, other · Livingston Parish, LA · due Jun 2030
  37. J4025 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,499MWProject · Gas, other · Monroe, MI · due Sep 2030
  38. J4024 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,499MWProject · Gas, other · Monroe, MI · due Sep 2030
  39. Ironwood Energy Center—1,485MWProject · Gas, combined cycle · Callahan, TX · due Jul 2032 · Ironwood Energy Center
  40. Duke Energy Progress, LLC—1,455MWProject · Gas, other · Person, NC · Duke Energy Progress, LLC
  41. J3799 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,452MWProject · Gas, other · Livingston, MI · due Apr 2030
  42. 957264—1,450MWProject · Gas, other · Anderson, SC
  43. J3922 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,445MWProject · Gas, other · Branch, MI · due Mar 2030
  44. J3923 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,414MWProject · Gas, other · Washtenaw, MI · due Mar 2030
  45. Bullock Gas—1,400MWProject · Gas, combined cycle · Hill, TX · due Jul 2032 · Bullock Data Center, LLC
  46. Liberty Thermal Energy Center—1,400MWProject · Gas, combined cycle · Hill, TX · due Jul 2032 · Liberty Data Center I, LLC
  47. Gen-2024-340 (status as of the file: SPP queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,400MWProject · Gas, other · Creek, OK · due Jan 2032
  48. 977731—1,394.9MWProject · Gas, other · Davidson, NC
  49. Comanche (OK)—1,372.8MWProject · Gas, combined cycle · Comanche, OK · due Sep 2029 · Public Service Co of Oklahoma
  50. Gen-2024-379 (status as of the file: SPP queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,350MWProject · Gas, other · Bossier Parish, LA · due Dec 2031
Planned projects in view, sorted by MW, descending
Project Matador NuclearProjectPlanned4,468MW—Dec 2031EIA-860M
Homer City Generating StationProjectPlanned4,396MW—Nov 2029EIA-860M
Atlas ComplexProjectPlanned3,200MW——Mar 2028CAISO
Brazos Energy SecurityProjectPlanned2,992MW—Sep 2030ERCOT
Schahfer CCGTsProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)2,739.8MW—Aug 2028Berkeley Lab
Pepper Hammock Solar and StorageProjectPlanned2,500MW—Sep 2029EIA-860M
Sunstone SolarProjectPlanned2,400MW—Dec 2027EIA-860M
Pointe Coupee Power StationProjectPlanned2,340.9MW—Oct 2031EIA-860M
J3996ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)2,220MW——Jan 2030Berkeley Lab
Deschutes Solar and BESSProjectPlanned2,000MW—Nov 2029EIA-860M
Q255ProjectPlanned2,000MW——Dec 2021Berkeley Lab
Smarr CCProjectPlanned2,000MW——Mar 2028Berkeley Lab
G0822ProjectPlanned2,000MW——Dec 2026Berkeley Lab
BM Great Rock Energy CenterProjectPlanned1,981.2MW—May 2029ERCOT
KingstonProjectPlanned1,830.6MW—Dec 2027EIA-860M
489ProjectPlanned1,689MW——Jun 2026Berkeley Lab
Prairie Ridge (Gas - CC)ProjectPlanned1,660.4MW—Jun 2032ERCOT
Sawtooth DevCo, LLCProjectPlanned1,650MW—Dec 2027Berkeley Lab
Sawtooth DevCo, LLCProjectPlanned1,650MW—Dec 2027Berkeley Lab
Q92ProjectPlanned1,650MW——Dec 2025Berkeley Lab
Franklin Farms 1&2ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,640MW—Aug 2028Berkeley Lab
Richland Parish Power Station 1&2ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,640MW—Aug 2028Berkeley Lab
977726ProjectPlanned1,620MW———Berkeley Lab
483ProjectPlanned1,600MW——Oct 2025Berkeley Lab
620ProjectPlanned1,600MW——Jun 2031Berkeley Lab
628ProjectPlanned1,600MW——Jun 2030Berkeley Lab
Hecate Energy Orem WindProjectPlanned1,542MW—Jun 2030ERCOT
J3999ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,540MW——Jan 2030Berkeley Lab
Aegle PowerProjectPlanned1,536.4MW—Jul 2027ERCOT
Bison Generation StationProjectPlanned1,518MW—Feb 2029EIA-860M
Big Canyon WindProjectPlanned1,500MW—Jul 2030ERCOT
Caldwell County Energy CenterProjectPlanned1,500MW—Apr 2030ERCOT
HolmanProjectPlanned1,500MW——Feb 2034CAISO
Q320ProjectPlanned1,500MW——Sep 2026Berkeley Lab
Q98ProjectPlanned1,500MW——Nov 2030Berkeley Lab
J4071ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,500MW——Jun 2030Berkeley Lab
J4025ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,499MW——Sep 2030Berkeley Lab
J4024ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,499MW——Sep 2030Berkeley Lab
Ironwood Energy CenterProjectPlanned1,485MW—Jul 2032ERCOT
Duke Energy Progress, LLCProjectPlanned1,455MW——Berkeley Lab
J3799ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,452MW——Apr 2030Berkeley Lab
957264ProjectPlanned1,450MW———Berkeley Lab
J3922ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,445MW——Mar 2030Berkeley Lab
J3923ProjectPlanned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,414MW——Mar 2030Berkeley Lab
Bullock GasProjectPlanned1,400MW—Jul 2032ERCOT
Liberty Thermal Energy CenterProjectPlanned1,400MW—Jul 2032ERCOT
Gen-2024-340ProjectPlanned (status as of the file: SPP queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,400MW——Jan 2032LBNL "Queued Up" data file — SPP region rows (Southwest Power Pool's queue as compiled by LBNL)
977731ProjectPlanned1,394.9MW———Berkeley Lab
Comanche (OK)ProjectPlanned1,372.8MW—Sep 2029EIA-860M
Gen-2024-379ProjectPlanned (status as of the file: SPP queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,350MW——Dec 2031LBNL "Queued Up" data file — SPP region rows (Southwest Power Pool's queue as compiled by LBNL)

Status not current MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); SPP queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0)

Status not current

The status is the one the file states on that date, not the register’s current one.

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted or drawn; each keeps its own page.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Underused, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Power lines Partial coverage

Transmission lines by voltage.

OpenStreetMap where loaded (Texas for now). Elsewhere LBNL's FERC/HIFLD set: only lines owned by FERC Form 1 filers, about a fifth of US mileage; most co-op and public power lines are missing.

© OpenStreetMap contributors (ODbL) · LBNL (CC BY 4.0)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Substations

Zoom in to see substations.

OpenStreetMap, where loaded (Texas for now).

© OpenStreetMap contributors (ODbL)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Pipelines

Pipelines by product, and the facilities along them.

EIA US Energy Atlas, as of January 2020. No CO2 or hydrogen lines.

EIA (public domain)

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Industrial price (county)

Average revenue per MWh, not a tariff quote. The median of the utilities serving each county.

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions