US energy projects and power plants, from first filing to retirement.
Public records, free to use. Every record links to its source.
- Pointe Coupee Power Station—2,340.9MW
- Franklin Farms 1&2 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,640MW
- Richland Parish Power Station 1&2 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,640MW
- Orange County Advanced Power Station—1,306MW
- Arkansas Cypress Solar Station—950MW
- Legend Power Station (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—820MW
- Vicksburg Advanced Power Station (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—820MW
- Jefferson Power Station—820MW
- Waterford 6—820MW
- Lakeover CCCT (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—820MW
- Traceview Advanced Power Station—819.4MW
- Westlake Power Station—819.4MW
- Delta Blues Advanced Power Station—818.7MW
- Richland Parish Power Station 3—780.3MW
- Richland Parish Power Station 4—780.3MW
- Entergy Louisiana LRZ 9 Generation Resource (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—770MW
- Lone Star Power Station (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—478MW
- Waterford 5 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—478MW
- Ironwood Power Station—467.3MW
- Cypress Harvest Solar Station—400MW
- Point Coupee (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—377MW
- Bogalusa West Solar Station—200MW
- Penton Solar Plant—190MW
- Segno Solar Station—170MW
- Votaw Solar Station—141MW
- Delta Solar Plant—80MW
- Sherwood Forest BESS—7.7MW
| Pointe Coupee Power Station | Project | Planned | 2,340.9MW | — | Oct 2031 | EIA-860M | |||
| Franklin Farms 1&2 | Project | Planned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | 1,640MW | — | Aug 2028 | Berkeley Lab | |||
| Richland Parish Power Station 1&2 | Project | Planned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | 1,640MW | — | Aug 2028 | Berkeley Lab | |||
| Orange County Advanced Power Station | Project | Under construction | 1,306MW | — | Oct 2026 | EIA-860M | |||
| Arkansas Cypress Solar Station | Project | Planned | 950MW | — | Jan 2029 | EIA-860M | |||
| Legend Power Station | Project | Planned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | 820MW | — | Sep 2027 | Berkeley Lab | |||
| Vicksburg Advanced Power Station | Project | Under construction (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | 820MW | — | Aug 2028 | EIA-860M | |||
| Jefferson Power Station | Project | Planned | 820MW | — | Nov 2029 | EIA-860M | |||
| Waterford 6 | Project | Planned | 820MW | — | Jun 2030 | EIA-860M | |||
| Lakeover CCCT | Project | Planned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | 820MW | — | Aug 2028 | Berkeley Lab | |||
| Traceview Advanced Power Station | Project | Under construction | 819.4MW | — | Aug 2028 | EIA-860M | |||
| Westlake Power Station | Project | Planned | 819.4MW | — | Oct 2030 | EIA-860M | |||
| Delta Blues Advanced Power Station | Project | Planned | 818.7MW | — | May 2028 | EIA-860M | |||
| Richland Parish Power Station 3 | Project | Planned | 780.3MW | — | Oct 2030 | EIA-860M | |||
| Richland Parish Power Station 4 | Project | Planned | 780.3MW | — | Oct 2030 | EIA-860M | |||
| Entergy Louisiana LRZ 9 Generation Resource | Project | Planned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | 770MW | — | Aug 2028 | Berkeley Lab | |||
| Lone Star Power Station | Project | Planned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | 478MW | — | Oct 2027 | Berkeley Lab | |||
| Waterford 5 | Project | Planned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | 478MW | — | Jun 2029 | EIA-860M | |||
| Ironwood Power Station | Project | Planned | 467.3MW | — | Jul 2028 | EIA-860M | |||
| Cypress Harvest Solar Station | Project | Planned | 400MW | — | Aug 2028 | EIA-860M | |||
| Point Coupee | Project | Planned (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current) | 377MW | — | Oct 2028 | Berkeley Lab | |||
| Bogalusa West Solar Station | Project | Planned | 200MW | — | Dec 2028 | EIA-860M | |||
| Penton Solar Plant | Project | Planned | 190MW | — | Mar 2028 | EIA-860M | |||
| Segno Solar Station | Project | Planned | 170MW | — | Mar 2029 | EIA-860M | |||
| Votaw Solar Station | Project | Planned | 141MW | — | May 2029 | EIA-860M | |||
| Delta Solar Plant | Project | Planned | 80MW | — | Nov 2027 | EIA-860M | |||
| Sherwood Forest BESS | Project | Planned | 7.7MW | — | Jul 2027 | EIA-860M |
Status not current MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0)
Status not current
The status is the one the file states on that date, not the register’s current one.
Generation ·
Interested in this project?
What is counted
- Counts follow the map: move it or pick a state.
- Planned and Construction: every project a register still lists.
- Withdrawn and canceled: not counted or drawn; each keeps its own page.
- Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
- No stage chosen: all stages together, retired plants left out.
- Built projects are drawn among the plants, never counted twice.
- Not on this map: projects placed only by county or state, or with the site withheld by license.
- They are counted, not drawn, once the view holds that whole area.
- Data center MW is demand, never added to generation.
Generation
Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.
Under Color: Underused, the least-run plants for their technology are darkest.
Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.
Pipelines and power lines
Gas pipelines and power lines, with gas processing and storage, LNG terminals, ethanol and renewable gas plants.
Industrial price (county)
Average revenue per MWh, not a tariff quote. The median of the utilities serving each county.
Fiber by county
Availability by county, not routes.
Unshaded: not stated.
Fiber providers (county, approx.). Providers reporting fiber availability somewhere in the county. Not a route to a site, not carrier-neutral or long-haul fiber.
Download grid data
- Power lines 203,951 rows · 68 MB
- Substations 69,120 rows · 7 MB
GeoParquet · snapshot Oct 10, 2026
© OpenStreetMap contributors, ODbL. A database you derive from these files must stay under ODbL.
Convert to GeoJSON or Shapefile:ogr2ogr -f GeoJSON lines.geojson lines.parquetogr2ogr -f 'ESRI Shapefile' lines.shp lines.parquet
Transmission lines layer: LBNL download page, Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0.