Show on map
115 kV line (OSM way 360195576) — Transmission lineGaines County — Postponed · Gas, combustion turbine · TX · 225 MW · 7.2 mi awayAC Ranch I — Under construction · Solar · NM · 75 MW · 10.5 mi awayAC Ranch II — Filed · Solar · NM · 230 MW · 10.5 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

115 kV line (OSM way 360195576)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
115 kV
States crossed
US-NM, US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
8
All 15 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id360195576
RegionUS-TX
Osm typeway
UndergroundNo
Voltage raw115000
Voltages kv115
Scope regionsUS-NM, US-TX
Voltage class100-161 kV
Extract regionsUS-NM, US-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source73

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Gaines County Postponed Gas, combustion turbine 7.2 mi 225
AC Ranch I Under construction Solar 10.5 mi 75
AC Ranch II Filed Solar 10.5 mi 230

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution