Show on map
138 kV line (OSM way 100306746) — Transmission lineTwo Rivers Solar — Postponed · Solar · TX · 214 MW · 6.4 mi awayCentral Utility Plant - Texas A&M — Announced · Gas, combined cycle · TX · 5 MW · 9.9 mi awayHoyte Solar — Under construction · Solar · TX · 206.8 MW · 12.6 mi awayMajor Oak Power — Postponed · Coal · TX · 600 MW · 14.9 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

138 kV line (OSM way 100306746)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Book a call About these actionsBook a call: our team gets you what you need.

Mapped route length (miles)
17
All 18 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id100306746
RegionUS-TX
Circuits1
Osm typeway
Frequency60
UndergroundNo
Voltage raw138000
Voltages kv138
Circuits raw1
Scope regionsUS-TX
Voltage class100-161 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source174

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Two Rivers Solar Postponed Solar 6.4 mi 214
Central Utility Plant - Texas A&M Announced Gas, combined cycle 9.9 mi 5
Hoyte Solar Under construction Solar 12.6 mi 206.8
Major Oak Power Postponed Coal 14.9 mi 600

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 28, 2026

Attribution