Show on map
138 kV line (OSM way 1248704259) — Transmission lineSandman Solar — Postponed · Battery storage · TX · 100 MW · 5.8 mi awayMallard Energy Storage — Under construction · Battery storage · TX · 250 MW · 9.1 mi awayBoxcar Energy Storage — Under construction · Battery storage · TX · 150 MW · 13.1 mi away
  • Storage
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

138 kV line (OSM way 1248704259)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
0
All 15 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id1248704259
RegionUS-TX
Osm typeway
UndergroundNo
Voltage raw138000
Voltages kv138
Scope regionsUS-TX
Voltage class100-161 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source3

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Sandman Solar Postponed Battery storage 5.8 mi 100
Mallard Energy Storage Under construction Battery storage 9.1 mi 250
Boxcar Energy Storage Under construction Battery storage 13.1 mi 150

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution