Show on map
69 kV line (OSM way 515655291) — Transmission lineOriana Solar LLC — Postponed · Battery storage · TX · 61 MW · 1.3 mi awayNew Hickory Solar — Built · Solar · TX · 209.2 MW · 14.0 mi away
  • Wind & solar
  • Operating
  • Other infrastructure
  • 10 · 100 · 1,000 MW

69 kV line (OSM way 515655291)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
69 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Book a call About these actionsBook a call: our team gets you what you need.

Mapped route length (miles)
0
All 18 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id515655291
RegionUS-TX
Circuits1
Osm typeway
Frequency60
UndergroundNo
Voltage raw69000
Voltages kv69
Circuits raw1
Scope regionsUS-TX
Voltage classunder 100 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source2

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Oriana Solar LLC Postponed Battery storage 1.3 mi 61
New Hickory Solar Built Solar 14.0 mi 209.2

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 28, 2026

Attribution