Show on map
69 kV line (OSM way 549848491) — Transmission lineOystercatcher Solar — Built · Solar · TX · 198.4 MW · 4.9 mi awayIon Solar (TX) — Postponed · Solar · TX · 384 MW · 7.9 mi awayHill County Generation Facility — Postponed · Gas, combustion turbine · TX · 928 MW · 10.5 mi awayHill Solar 1 — Under construction · Solar · TX · 405 MW · 12.8 mi awayYellow Cat Wind, LLC — Under construction · Wind · TX · 262 MW · 13.5 mi awayHill Solar II — Under construction · Solar · TX · 200 MW · 14.3 mi awayDolomite Storage — Filed · Battery storage · TX · 125.7 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • Other infrastructure
  • 10 · 100 · 1,000 MW

69 kV line (OSM way 549848491)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
69 kV
States crossed
US-TX

Details

Who’s behind it

No companies named in filings yet.

Book a call About these actionsBook a call: our team gets you what you need.

Mapped route length (miles)
2
All 14 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Osm id549848491
RegionUS-TX
Osm typeway
UndergroundNo
Voltage raw69000
Voltages kv69
Scope regionsUS-TX
Voltage classunder 100 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source13

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Oystercatcher Solar Built Solar 4.9 mi 198.4
Ion Solar (TX) Postponed Solar 7.9 mi 384
Hill County Generation Facility Postponed Gas, combustion turbine 10.5 mi 928
Hill Solar 1 Under construction Solar 12.8 mi 405
Yellow Cat Wind, LLC Under construction Wind 13.5 mi 262
Hill Solar II Under construction Solar 14.3 mi 200
Dolomite Storage Filed Battery storage 14.9 mi 125.7

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 28, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution