- Bioenergy
- Operating
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Operating
ADS Renewable Energy-Wolf Creek LLC: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
ADS Renewable Energy-Wolf Creek LLC
Power plant · Biomass
Key facts
Power plant · Biomassran 48% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2025
- 11,755 MWh
- Grid
- 25 kV to Oconee Electric Member Corp (SOCO)
- Location
- Twiggs County, Georgia
- Operated by
- ADS Renewable Energy- Wolf Creek, LLC
Operations
- Net generation, 2025
- 11,755
MWh - Fuel burned, 2025
- 145,663
MMBtu - Capacity factor, 2025
- 47.9
% - Heat rate, 2025
- 12,392
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 11,755 | 145,663 | 47.9% | 12,392 |
| 2024 | 18,065 | 213,601 | 73.5% | 11,824 |
| 2023 | 17,739 | 226,026 | 72.3% | 12,742 |
| 2022 | 17,500 | 219,937 | 71.4% | 12,568 |
| 2021 | 20,535 | 227,525 | 83.7% | 11,080 |
| 2020 | 19,641 | 209,464 | 79.9% | 10,665 |
| 2019 | 21,191 | 228,492 | 86.4% | 10,782 |
| 2018 | 19,273 | 212,433 | 78.6% | 11,022 |
| 2017 | 18,118 | 191,341 | 73.9% | 10,561 |
| 2016 | 17,964 | 201,821 | 73.0% | 11,235 |
| 2015 | 20,158 | 187,094 | 82.2% | 9,281 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.