Albany Medical Ctr Cogen Plant

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 82% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
29,450 MWh
Grid
34 kV to Niagara Mohawk Power Corp. (NYIS)
Location
Albany County, New York
Operated by
Albany Medical CenterSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2025
Fuel burned MMBtu by year, 2014 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
2 years since 2024
Unused energy
6 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
18,736 Btu/kWh 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025551,790
Capacity factor, 20250.820
Heat rate (Btu/kWh), 202518,736.5
Net generation (MWh), 202529,450
Balancing authority codeNYIS

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
8.9 MW
Generators retired
2
Capacity still in service
4.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GTG1Natural Gas Fired Combustion Turbine4.6 MWRetiredJune 2020
GTG1ANatural Gas Fired Combustion Turbine4.3 MWRetiredOctober 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
34 kV
Transmission or distribution system owner
Niagara Mohawk Power Corp.
Balancing authority
New York Independent System Operator
NERC region
NPCC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GTG1A scheduled to retire, 4.3 MW · EIA-860M
  • In service · EIA-860M
  • Stated Unit GTG1 scheduled to retire, 4.6 MW · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SunEast Hilltop Solar Project Postponed Solar 12.7 mi 20
Bridgewater 1 Announced Solar 13.3 mi 5
Bridgewater 2 Announced Solar 13.3 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution