Show on map
Blue Cypress Solar Energy Center — Power plant · Solar · Florida Power & Light CoAmbersweet — Under construction · Solar · FL · 74.5 MW · 6.3 mi awaySpanish Moss — Under construction · Solar · FL · 74.5 MW · 7.1 mi awayTangelo — Under construction · Solar · FL · 74.5 MW · 14.1 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Blue Cypress Solar Energy Center

Power plant · Solar

Key facts

Power plant · Solarran 20% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
131,311 MWh
Grid
230 kV to Florida Power & Light Co (FPL)
Location
Indian River County, Florida
Operated by
Florida Power & Light CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805329
Location id
L100000804614
Eia plant ids
61029
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
230
Transmission owner
Florida Power & Light Co
Balancing authority code
FPL
Balancing authority name
Florida Power & Light Company
Fuel burned (MMBtu), 2025448,033
Capacity factor, 20250.201
Net generation (MWh), 2025131,311
Balancing authority codeFPL

Solar arrays

Array area (acres)
312.6
AC capacity (MW)
74.5
DC capacity (MW)
113.2
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Ambersweet Under construction Solar 6.3 mi 74.5
Spanish Moss Under construction Solar 7.1 mi 74.5
Tangelo Under construction Solar 14.1 mi 74.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution