Blue Water Energy Center
- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Blue Water Energy Center: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Blue Water Energy Center
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 75% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2022
- Net generation, 2025
- 8,350,867 MWh
- Grid
- 345 kV to ITC Transmission (MISO)
- Location
- St Clair County, Michigan
- Operated by
- DTE Electric Company
Operations
- Net generation, 2025
- 8,350,867
MWh - Fuel burned, 2025
- 53,320,538
MMBtu - Capacity factor, 2025
- 75.2
% - Heat rate, 2025
- 6,385
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 3,403,266 | 22,296,801 | — | 6,552 |
| 2025 | 8,350,867 | 53,320,538 | 75.2% | 6,385 |
| 2024 (11 of 12 months) | 7,440,041 | 47,414,405 | — | 6,373 |
| 2023 | 8,216,638 | 52,098,503 | 74.0% | 6,341 |
| 2022 (7 of 12 months) | 4,496,030 | 28,469,616 | — | 6,332 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.