Show on map
Bozeman Road - Tinnin Road 230 kV — Transmission lineHinds Solar, LLC — Under construction · Solar · MS · 150 MW · 0.5 mi awayAmazon Madison Mega Site — Built · Large load · MS · 2.5 mi awayTraceview Advanced Power Station — Under construction · Gas, combined cycle · MS · 819.4 MW · 5.1 mi awayJACKSON DATA CENTER — Large load · MS · 6.9 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Bozeman Road - Tinnin Road 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-MS
Owner (as stated)
Entergy Mississippi

Details

Who’s behind it

Owner
Entergy Mississippi

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
29
Substations at the ends (as the source names them)
Bozeman Road to Tinnin Road
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itentergy mississippi
HIFLD line ID174857
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hinds Solar, LLC Under construction Solar 0.5 mi 150
Amazon Madison Mega Site Built Large load 2.5 mi
Traceview Advanced Power Station Under construction Gas, combined cycle 5.1 mi 819.4
JACKSON DATA CENTER Unknown Large load 6.9 mi

Sources EIA-860M · EPA ICIS-Air · Epoch AI · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • Epoch AIOpen license, with credit · retrieved Nov 23, 2026Epoch AI, AI data centers (Frontier Data Centers hub), CC BY 4.0, https://epoch.ai/data/ai-data-centers. Modified by Inframation: selected rows and columns only; figures are Epoch AI's estimates and are shown as such; names and statuses mapped to Inframation's vocabulary.
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution