Show on map
Brokaw - Pontiac Midpoint 345 kV — Transmission lineSV CSG North Creek 1 — Permitted · Solar · IL · 2.1 MW · 5.1 mi awayBright Stalk Wind Farm II — Postponed · Wind · IL · 205.2 MW · 5.2 mi awayKieser — Under construction · Solar · IL · 5 MW · 5.5 mi awaySV CSG Bloomington — Permitted · Solar + storage · IL · 10 MW · 6.8 mi awayWashington Street Solar 1 LLC — Under construction · Solar · IL · 5 MW · 7.8 mi awayPanther Grove 2 — Under construction · Wind · IL · 472.5 MW · 10.6 mi awayCottonwood - IL — Under construction · Solar · IL · 4.9 MW · 12.7 mi awayBlackstone Wind Farm IV — Postponed · Wind · IL · 100 MW · 14.0 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Brokaw - Pontiac Midpoint 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-IL
Owner (as stated)
Ameren Illinois

Details

Who’s behind it

Owner
Ameren Illinois

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
32
Substations at the ends (as the source names them)
Brokaw to Pontiac Midpoint
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itameren illinois
HIFLD line ID117160
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SV CSG North Creek 1 Permitted Solar 5.1 mi 2.1
Bright Stalk Wind Farm II Postponed Wind 5.2 mi 205.2
Kieser Under construction Solar 5.5 mi 5
SV CSG Bloomington Permitted Solar + storage 6.8 mi 10
Washington Street Solar 1 LLC Under construction Solar 7.8 mi 5
Panther Grove 2 Under construction Wind 10.6 mi 472.5
Cottonwood - IL Under construction Solar 12.7 mi 4.9
Blackstone Wind Farm IV Postponed Wind 14.0 mi 100

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution