Show on map
Brooksville West - Brookridge 230 kV — Transmission linePasco Cnty Solid Waste Resource Recovery — Under construction · Waste to energy · FL · 17 MW · 11.5 mi awayShady Hills Combined Cycle Facility — Under construction · Gas, combined cycle · FL · 612 MW · 11.6 mi awayShady Hills Generating Station — Postponed · Gas, combustion turbine · FL · 518 MW · 11.6 mi away
  • Combustion
  • Bioenergy
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Brooksville West - Brookridge 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-FL
Owner (as stated)
Duke Energy Florida

Details

Who’s behind it

Owner
Duke Energy Florida

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
3
Substations at the ends (as the source names them)
Brooksville West to Brookridge
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy florida
HIFLD line ID146204
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pasco Cnty Solid Waste Resource Recovery Under construction Waste to energy 11.5 mi 17
Shady Hills Combined Cycle Facility Under construction Gas, combined cycle 11.6 mi 612
Shady Hills Generating Station Postponed Gas, combustion turbine 11.6 mi 518

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution