Show on map
Buffalo Ridge Windplant WPP 1993 — Power plant · Wind · FPL Energy Operating Services, Inc.
  • Wind & solar
  • Retired
  • 10 · 100 · 1,000 MW

Buffalo Ridge Windplant WPP 1993

Power plant · Wind

Key facts

Power plant · Windran 28% of 2015 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1994
Net generation, 2015
54,267 MWh
Grid
12 kV to Northern States Power Co - Minnesota (MISO)
Location
Lincoln County, Minnesota

Output

Net generation MWh by year, 2001 to 2016

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Wind source: “Onshore Wind Turbine”
Age
32 years since 1994
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
November 2016
Capacity retired
21.9 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
EXISOnshore Wind Turbine21.9 MWRetiredNovember 2016

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Northern States Power Co - Minnesota
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Transmission lines within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Shaw Creek Solar Owner 100.0% Dec 31, 2025 EIA-860
FPL Energy Operating Services, Inc. Operator EIA-860M

Timeline

  • Stated Unit EXIS scheduled to retire, 21.9 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution