Show on map
Calderwood 161 kV line — Transmission lineVonore Battery Energy Storage System — Under construction · Storage · TN · 20 MW · 14.3 mi away
  • Storage
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Calderwood 161 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
161 kV
States crossed
US-TN
Owner (as stated)
Brookfield Smoky Mountain Hydropower

Details

Who’s behind it

Owner
Brookfield Smoky Mountain Hydropower

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
22
Substations at the ends (as the source names them)
Calderwood
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itbrookfield smoky mountain hydropower
HIFLD line ID141369
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Vonore Battery Energy Storage System Under construction Storage 14.3 mi 20

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution