Show on map
Camden South Carolina — Power plant · Gas, steam turbine · Invista
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Camden South Carolina

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbine Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1993
Net generation, 2025
0 MWh
Grid
115 kV to Dominion Energy South Carolina, Inc (CPLE)
Location
Kershaw County, South Carolina
Operated by
Invista

Output

Net generation MWh by year, 2002 to 2026
Fuel burned MMBtu by year, 2002 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
33 years since 1993
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000587179
Subparts reported
C
NAICS code
325211
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000276
Eia status
By code
OS
Mw
19
Units
1
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
19
Out of service mw
19
Fuel burned (MMBtu), 2025613,119
Net generation (MWh), 20250
Balancing authority codeCPLE
Data notes (2)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
  • Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive

Retirement

Capacity retired
11 MW
Generators retired
2
Capacity still in service
19 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Steam Turbine5.5 MWRetiredNovember 2019
GEN2Natural Gas Steam Turbine5.5 MWRetiredNovember 2019

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Dominion Energy South Carolina, Inc
Balancing authority
Duke Energy Progress East
NERC region
SERC
Transmission lines within 15 mi (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
KOCH INDUSTRIES INC Owner 100.0% Dec 31, 2023 EPA GHGRP
Invista Operator EIA-860M

Timeline

  • Stated Units GEN1, GEN2 scheduled to retire, 11 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution