Campbell Industrial Park BESS — Power plant · Storage · Hawaiian Electric Co IncKalaeloa Home Lands Solar — Under construction · Solar · HI · 1.7 MW · 1.2 mi awayKalaeloa Solar One — Postponed · Solar · HI · 6 MW · 1.6 mi awayBarbers Point Solar, LLC — Postponed · Solar + storage · HI · 30 MW · 4.0 mi awayEKS Solar Farm — Postponed · Solar · HI · 5 MW · 4.8 mi awayKupehau — Postponed · Solar + storage · HI · 120 MW · 9.5 mi awayPuuloa Energy — Announced · Biomass · HI · 103.4 MW · 10.3 mi awayAES Mountain View Solar — Under construction · Solar + storage · HI · 14 MW · 11.4 mi awayAES Waiawa Phase 2 Solar — Under construction · Solar + storage · HI · 60 MW · 11.8 mi awayPuuloa Solar — Announced · Solar + storage · HI · 12.4 MW · 11.9 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Campbell Industrial Park BESS

Power plant · Storage

Key facts

Power plant · Storage Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2016
Net generation, 2020
0 MWh
Grid
12 kV to Hawaiian Electric Co Inc (HECO)
Location
Honolulu County, Hawaii
Operated by
Hawaiian Electric Co IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2020

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Storage source: “Batteries”
Age
10 years since 2016
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeHECO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
February 2020
Capacity retired
1 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
CIPB1Batteries1 MWRetiredFebruary 2020

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
12 kV
Transmission or distribution system owner
Hawaiian Electric Co Inc
Balancing authority
Hawaiian Electric Co Inc
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit CIPB1 scheduled to retire, 1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Kalaeloa Home Lands Solar Under construction Solar 1.2 mi 1.7
Kalaeloa Solar One Postponed Solar 1.6 mi 6
Barbers Point Solar, LLC Postponed Solar + storage 4.0 mi 30
EKS Solar Farm Postponed Solar 4.8 mi 5
Kupehau Postponed Solar + storage 9.5 mi 120
Puuloa Energy Announced Biomass 10.3 mi 103.4
AES Mountain View Solar Under construction Solar + storage 11.4 mi 14
AES Waiawa Phase 2 Solar Under construction Solar + storage 11.8 mi 60
Puuloa Solar Announced Solar + storage 11.9 mi 12.4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution