Show on map
Canadys - Yemassee 230 kV — Transmission lineSouthard Solar — Postponed · Solar · SC · 6 MW · 0.6 mi away15428 SGR 2A Data Center — Filed · Large load · SC · 8.1 mi awayMay Renewables — Postponed · Solar + storage · SC · 200 MW · 11.8 mi awayColleton Solar — Permitted · Solar · SC · 74.9 MW · 13.4 mi awayColleton Solar — Postponed · Storage · SC · 74.9 MW · 13.4 mi away
  • Wind & solar
  • Loads
  • In development
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Canadys - Yemassee 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-SC
Owner (as stated)
Dominion Energy South Carolina

Details

Who’s behind it

Owner
Dominion Energy South Carolina

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
30
Substations at the ends (as the source names them)
Canadys to Yemassee
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itdominion energy south carolina
HIFLD line ID100431
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Southard Solar Postponed Solar 0.6 mi 6
15428 SGR 2A Data Center Filed Large load 8.1 mi
May Renewables Postponed Solar + storage 11.8 mi 200
Colleton Solar × 2 units Permitted Solar 13.4 mi 149.8

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution