Show on map
Clover Creek Solar Community Solar — Power plant · Solar · AES Distributed EnergyGRANITE FORTRESS LLC - JUAB DATA CENTER — Under construction · Large load · UT · 4.1 mi awayData Center 3 — Filed · Large load · UT · 5.4 mi awayData Center 1 — Filed · Large load · UT · 6.1 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Clover Creek Solar Community Solar

Power plant · Solar

Key facts

Power plant · Solarran 28% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
196,528 MWh
Grid
345 kV to PacifiCorp (PACE)
Location
Juab County, Utah
Operated by
AES Distributed EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805543
Location id
L100000804810
Eia plant ids
63061
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
345
Transmission owner
PacifiCorp
Balancing authority code
PACE
Balancing authority name
PacifiCorp - East
Fuel burned (MMBtu), 2025670,553
Capacity factor, 20250.280
Net generation (MWh), 2025196,528
Balancing authority codePACE

Solar array

Array area (acres)
493
AC capacity (MW)
80
DC capacity (MW)
107.3
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
GRANITE FORTRESS LLC - JUAB DATA CENTER Under construction Large load 4.1 mi
Data Center 3 Filed Large load 5.4 mi
Data Center 1 Filed Large load 6.1 mi

Sources EPA ICIS-NPDES · FAA OE/AAA

Sources

Attribution