Coralville GT: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Coralville GT
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1970
- Net generation, 2025
- 2,498 MWh
- Grid
- 69 kV to MidAmerican Energy Co (MISO)
- Location
- Johnson County, Iowa
- Operated by
- MidAmerican Energy CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 2,498
MWh - Fuel burned, 2025
- 50,497
MMBtu - Capacity factor, 2025
- 0.4
% - Heat rate, 2025
- 20,215
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 2,498 | 50,497 | 0.4% | 20,215 |
| 2024 | 800 | 20,402 | 0.1% | 25,502 |
| 2023 | 1,028 | 27,064 | 0.2% | 26,327 |
| 2022 | 2,843 | 49,291 | 0.4% | 17,338 |
| 2021 | 3,220 | 66,872 | 0.5% | 20,768 |
| 2020 | -48 | 15,118 | — | — |
| 2019 | -716 | 6,809 | — | — |
| 2018 | 271 | 25,803 | 0.0% | — |
| 2017 | 715 | 28,451 | 0.1% | — |
| 2016 | 165 | 19,160 | 0.0% | — |
| 2015 | -754 | 6,970 | — | — |
| 2014 | -223 | 17,475 | — | — |
| 2013 | -492 | 10,245 | — | — |
| 2012 | 584 | 42,383 | 0.1% | — |
| 2011 | 498 | 32,420 | 0.1% | — |
| 2010 | 548 | 35,347 | 0.1% | — |
| 2009 | 862 | 29,106 | 0.1% | — |
| 2008 | -320 | 276 | — | — |
| 2007 | -227 | 15,131 | — | — |
| 2006 | 149 | 12,007 | 0.0% | — |
| 2005 | -528 | 2,474 | — | — |
| 2004 | -33 | 8,360 | — | — |
| 2003 (11 of 12 months) | -430 | 2,117 | — | — |
| 2002 | -193 | 4,313 | — | — |
| 2001 | 3,532 | 55,059 | 0.6% | 15,589 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.