CPS Energy substation (OSM way 1010267844)
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
CPS Energy substation (OSM way 1010267844): location and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
CPS Energy substation (OSM way 1010267844)
Substation
Key facts
Substation Operating- States crossed
- US-TX
- Operated by
- CPS Energy
Details
Who’s behind it
No companies named in filings yet.
Book a call
About these actionsBook a call: our team gets you what you need.
Capacity not stated
All 16 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
| Attribute | Value |
|---|---|
| Osm id | 1010267844 |
| Region | US-TX |
| Outline |
|
| Osm type | way |
| Voltage (kV) | 138 |
| Voltage raw | 138000 |
| Voltages kv | 138 |
| Scope regions | US-TX |
| Voltage class | 100-161 kV |
| States crossed | US-TX |
| Extract regions | US-TX |
| Location method | area_centroid |
| Substation type | distribution |
| Voltage unknown | No |
| Coverage regions | US-TX |
| Voltage assumed kv | No |
Sources
1 sourceSources OpenStreetMap
© OpenStreetMap contributors
Sources
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Padua 3 Under construction | Battery storage | 5.1 mi | 200 |
| Alamo City ESS Contracted | Battery storage | 5.8 mi | 128.2 |
| Rush ESS Studied | Battery storage | 6.8 mi | 201.3 |
| El Patrimonio Contracted | Solar | 7.9 mi | 152.3 |
| Alamo 3 BESS 2 Postponed | Battery storage | 12.3 mi | 100 |