Show on map
CUA West Campus - South (CSG) — Power plant · Solar · Standard SolarCHP Plant — Under construction · Gas, combustion turbine · DC · 5.7 MW · 1.4 mi awayMadison Solar 1 LLC — Postponed · Solar · DC · 1.2 MW · 7.9 mi awayGANNETT COMPANY — Built · Large load · MD · 8.6 mi awayPROSPERITY DRIVE DATA CENTER, LLC — Built · Large load · MD · 8.8 mi awayVERIZON FAIRLAND DATA CENTER — Built · Large load · MD · 9.6 mi awayADP OF WASHINGTON — Built · Large load · MD · 10.0 mi awayNORTHROP GRUMMAN SYSTEMS CORPORATION — Built · Large load · VA · 11.0 mi awayZAYO GROUP, LLC — Built · Large load · VA · 11.4 mi awayValo Park — Built · Large load · VA · 11.6 mi awayVIENNA CLOUD — Built · Large load · VA · 11.9 mi awayFreddie Mac Building - 8250 Jones Branch Drive — Built · Large load · VA · 12.1 mi awayGENERAL ELECTRIC, ROCKVILLE — Built · Large load · MD · 13.4 mi awayNCBP ONE, LLC — Under construction · Solar · MD · 2.5 MW · 14.9 mi awayNCBP TEN, LLC — Under construction · Solar · MD · 1.4 MW · 15.0 mi awayNCBP Seven — Under construction · Solar · MD · 2.4 MW · 15.0 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

CUA West Campus - South (CSG)

Power plant · Solar

Key facts

Power plant · Solarran 19% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
4,716 MWh
Grid
4 kV to Potomac Electric Power Co (PJM)
Location
District of Columbia County, the District of Columbia
Operated by
Standard SolarSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001048592
Location id
L100001043090
Eia plant ids
67707
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
3.60
Transmission owner
Potomac Electric Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 202516,091
Capacity factor, 20250.192
Net generation (MWh), 20254,716
Balancing authority codePJM

Solar array

Array area (acres)
1.4
AC capacity (MW)
2.8
DC capacity (MW)
2.8
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CHP Plant Under construction Gas, combustion turbine 1.4 mi 5.7
Madison Solar 1 LLC Postponed Solar 7.9 mi 1.2
GANNETT COMPANY Built Large load 8.6 mi
PROSPERITY DRIVE DATA CENTER, LLC Built Large load 8.8 mi
VERIZON FAIRLAND DATA CENTER Built Large load 9.6 mi
ADP OF WASHINGTON Built Large load 10.0 mi
NORTHROP GRUMMAN SYSTEMS CORPORATION Built Large load 11.0 mi
ZAYO GROUP, LLC Built Large load 11.4 mi
Valo Park Built Large load 11.6 mi
VIENNA CLOUD Built Large load 11.9 mi
Freddie Mac Building - 8250 Jones Branch Drive Built Large load 12.1 mi
GENERAL ELECTRIC, ROCKVILLE Built Large load 13.4 mi
NCBP ONE, LLC Under construction Solar 14.9 mi 2.5
NCBP TEN, LLC Under construction Solar 15.0 mi 1.4
NCBP Seven Under construction Solar 15.0 mi 2.4

Sources EIA-860M · EPA ICIS-Air · Virginia DEQ

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality

Attribution