Cuyamaca Peak Energy Plant — Power plant · Gas, combustion turbine · San Diego Gas & Electric Co
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Cuyamaca Peak Energy Plant

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2025
9,748 MWh
Grid
69 kV to San Diego Gas & Electric Co (CISO)
Location
San Diego County, California

Operations

Net generation, 2025
9,748MWh
Fuel burned, 2025
86,162MMBtu
Capacity factor, 2025
2.3%
Heat rate, 2025
8,839Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20259,74886,1622.3%8,839
20245,87467,9811.4%11,573
202312,085140,4002.8%11,618
202212,625145,2783.0%11,507
20218,18294,8181.9%11,589
20206,78178,3631.6%11,556
20197,03781,7431.7%11,616
201814,888170,5583.5%11,456
20178,53899,2292.0%11,622
20168,17694,3611.9%11,541
201510,280116,8782.4%11,370
201423,354262,7475.5%11,251
201340,203449,1669.4%11,172
201246,532519,33610.9%11,161
201119,837219,6854.7%11,074
201013,799176,2033.2%12,769
200917,823199,5024.2%11,194
200812,038131,5452.8%10,928
200730,168333,8357.1%11,066
20067,90789,0121.8%11,257
20059,193101,3102.1%11,020
200417,524191,7224.1%10,940
20037,65986,6041.8%11,308
200227,383307,7516.4%11,239
2001 (4 of 12 months)00——
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

3 sources

Sources EIA-860M · GEM · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)