Show on map
Delilah Solar Energy II LLC — Power plant · Solar · Invenergy Services LLCSGT Hoskins Solar Project Hybrid — Announced · Solar + storage · TX · 306.2 MW · 11.1 mi awayLupinus Storage 3 — Postponed · Battery storage · TX · 50.9 MW · 12.5 mi awayEchols Grove Solar — Contracted · Solar · TX · 200.9 MW · 14.3 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Delilah Solar Energy II LLC

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
558,764 MWh
Grid
345 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Red River County, Texas
Operated by
Invenergy Services LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
345
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20251,906,503
Capacity factor, 20250.206
Net generation (MWh), 2025558,764
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SGT Hoskins Solar Project Hybrid Announced Solar + storage 11.1 mi 306.2
Lupinus Storage 3 Postponed Battery storage 12.5 mi 50.9
Echols Grove Solar Contracted Solar 14.3 mi 200.9

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 28, 2026

Attribution