Show on map
Dike City Power Plant — Power plant · Oil · City of Dike - (IA)Washburn Wind Farm — Postponed · Wind · IA · 70 MW · 14.2 mi away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Dike City Power Plant

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2005
Net generation, 2025
4 MWh
Grid
72 kV to Corn Belt Power Coop (MISO)
Location
Grundy County, Iowa
Operated by
City of Dike - (IA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2005 to 2025
Fuel burned MMBtu by year, 2005 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Oil source: “Petroleum Liquids”
Age
21 years since 2005
Unused energy
19 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
19,250 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
72
Transmission owner
Corn Belt Power Coop
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 202577
Capacity factor, 20250.000
Heat rate (Btu/kWh), 202519,250
Net generation (MWh), 20254
Balancing authority codeMISO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Washburn Wind Farm Postponed Wind 14.2 mi 70

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution