Show on map
Eagle Valley Clean Energy LLC Biomass — Power plant · Biomass · Eagle Valley Clean Energy LLC
  • Bioenergy
  • Retired
  • 10 · 100 · 1,000 MW

Eagle Valley Clean Energy LLC Biomass

Power plant · Biomass

Key facts

Power plant · Biomass Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
0 MWh
Grid
25 kV to Holy Cross Electric Assn, Inc (PSCO)
Location
Eagle County, Colorado

Output

Net generation MWh by year, 2013 to 2025
Fuel burned MMBtu by year, 2013 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Biomass source: “Wood/Wood Waste Biomass”
Age
13 years since 2013
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Greenbacker Renewable Energy Co LLC
Share pct
100
Gem entity id
E100000135627
Unit ids
G100001093932
Location id
L100001083221
Eia plant ids
58574
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071159299
Subparts reported
C
NAICS code
221117
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1011681
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codePSCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
March 2024
Capacity retired
12.6 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
01Wood/Wood Waste Biomass12.6 MWRetiredMarch 2024

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
25 kV
Transmission or distribution system owner
Holy Cross Electric Assn, Inc
Balancing authority
Public Service Company of Colorado
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
EVERGREEN CLEAN ENERGY CORP Owner 100.0% Dec 31, 2023 EPA GHGRP
Eagle Valley Clean Energy LLC Operator EIA-860M

Timeline

  • Stated Unit 01 scheduled to retire, 12.6 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source