Eagle Valley Clean Energy LLC Biomass
- Bioenergy
- Retired
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Retired
Eagle Valley Clean Energy LLC Biomass: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Eagle Valley Clean Energy LLC Biomass
Power plant · Biomass
Key facts
Power plant · Biomass Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2013
- Net generation, 2025
- 0 MWh
- Grid
- 25 kV to Holy Cross Electric Assn, Inc (PSCO)
- Location
- Eagle County, Colorado
- Operated by
- Eagle Valley Clean Energy LLC
Output
- Biomass and waste
Details
Who’s behind it
Interested in this project?
- Technology
- Biomass source: “Wood/Wood Waste Biomass”
- Age
- 13 years since 2013
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | 0 |
| Balancing authority code | PSCO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2024
- Capacity retired
- 12.6 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 01 | Wood/Wood Waste Biomass | 12.6 MW | Retired | March 2024 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 25 kV
- Transmission or distribution system owner
- Holy Cross Electric Assn, Inc
- Balancing authority
- Public Service Company of Colorado
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| EVERGREEN CLEAN ENERGY CORP | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Eagle Valley Clean Energy LLC | Operator | EIA-860M |
Timeline
- Stated Unit 01 scheduled to retire, 12.6 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory