Show on map
Eaton Park 230 kV line — Transmission lineLKL Kingfisher, LLC — Postponed · Solar · FL · 6 MW · 2.2 mi awayC D McIntosh Jr — Postponed · Oil · FL · 304 MW · 4.7 mi awayPace Road Battery Storage — Permitted · Storage · FL · 20 MW · 9.7 mi awayHines Energy Complex — Postponed · Gas, combined cycle · FL · 1,034 MW · 9.9 mi awayMattaniah Solar — Under construction · Solar · FL · 52 MW · 10.0 mi awayTide Bay — Postponed · Solar · FL · 74.9 MW · 12.4 mi awayBrewster Solar — Under construction · Solar · FL · 40 MW · 13.8 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Eaton Park 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-FL

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
9
Substations at the ends (as the source names them)
Eaton Park
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID150861
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
LKL Kingfisher, LLC Postponed Solar 2.2 mi 6
C D McIntosh Jr Postponed Oil 4.7 mi 304
Pace Road Battery Storage Permitted Storage 9.7 mi 20
Hines Energy Complex Postponed Gas, combined cycle 9.9 mi 1,034
Mattaniah Solar Under construction Solar 10.0 mi 52
Tide Bay Postponed Solar 12.4 mi 74.9
Brewster Solar Under construction Solar 13.8 mi 40

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution