- Wind & solar
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
Eland Solar & Storage Center, Phase 1 Hy: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Eland Solar & Storage Center, Phase 1 Hy
Power plant · Solar
Key facts
Power plant · Solarran 17% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2024
- Net generation, 2025
- 684,009 MWh
- Grid
- 230 kV to Los Angeles Department of Water & Power (LDWP)
- Location
- Kern County, California
- Operated by
- 68SF 8me LLC
Operations
- Net generation, 2025
- 684,009
MWh - Fuel burned, 2025
- 2,409,630
MMBtu - Capacity factor, 2025
- 17.0
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2026 (8 of 12 months) | 486,897 | 1,715,725 | — | — |
| 2025 | 684,009 | 2,409,630 | 17.0% | — |
| 2024 (2 of 12 months) | 68,309 | 243,951 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.